Font Size: a A A

Research On The Selection Of Management Model On Convention And Exhibition Project Of Pico Exhibition Group

Posted on:2015-10-18Degree:MasterType:Thesis
Country:ChinaCandidate:J Y LiaoFull Text:PDF
GTID:2272330467489307Subject:Business Administration
Abstract/Summary:PDF Full Text Request
Today the world economy is facing unprecedented opportunities and challenges, how to seize the opportunity and face the challenge is the main concern of economic bodies involved in the field. With the Booming of global exhibition industry, the competition was fierce increasingly. The requirement for the management level of exhibition construction project have become increasingly demanding. At the same time, the management model of exhibition construction project continues to evolve, there were many new models in the world. The exhibition enterprise are the core of the exhibition industry and were in the dominant position of the field, the innovation of construction management model is the driving force for exhibition business to cope with the economic crisis and international competition, as well as enhance the core competitiveness. The introduction of foreign advanced management model in exhibition construction project is bound to have an impact on China’s exhibition industry, there are urgent needs for the analysis and research of exhibition project management model. How to choose a reasonable management model which suitable for exhibition construction projects in order to ensure a smooth and successful operation was settled to be solvedThe rest of this paper is organized as follows:(1) This paper explains the concepts of project management model. Including project and program management, and explains the basic concepts of the exhibition project management. In addition, the research on the characteristics of the exhibition project. Currently proposed in the exhibition project management mode selection on the problems。(2)This paper introduces the basic situation of Pico Exhibition Group.pen exhibition group,Including Pico Exhibition Group’s major customers; business content management involves exhibition projects;exhibition project management problems in the Group’s market positioning strategy and exhibition project.(3)Analysis of the common exhibition project management, project management and exhibition mode selection factors. On this basis, the exhibition gives the right project management method for determining the weight indicator system.(4)Analysis of the PMC and EPC model management model implementation process Pico Group adopted and proposed implementation process of emerging issues and safeguards.
Keywords/Search Tags:Convention and exhibition engineering project management, managementmodel, Comparative analysis
PDF Full Text Request
Related items