| With the reform of railway transportation, security management has changed from the original single feedback control mode to the accident prevention moder n management model, its core is to avoid accidents. How to change railway ma nagement type from accident prevent into question, to protect the safety of railw ay transport work, has become an urgent problem.This thesis start from the rail transport control,combine the computer monitor, computer controls, accounting records and occupy board to develop a early war ning system,it contains information collection, transmission, early warning, proces sing. First,analysis the current status and safety warning system at home and abr oad. Second, comprehend the station workflow, combined Zhanyi situation to stu dy how to change control from artificial control computer control and computer monitoring system with the railway information connection, to achieve system sta tus automatic conversion, and in order to improve the efficiency of the railway workers,change the account type from manual records to computer, and from the workers’ require develop a occupy board. Finally,from the need of early warnin g systems, the station workflow, date transmission, system architecture and datab ase, on this basis, using VC++as a development tool, designed and developed railway traffic early warning system.Based on the design and development work, the thesis test the early warning functions and communication functions of railway traffic early warning system. After testing, the system can provide early warning station staff like temporary s peed limit range, power range, derail and other early warning information, impro ve operational efficiency, ensuring the safe transport of railway work, test results show that the railway traffic early warning system has a high the practical valu... |