Quality Management Of Project For Glass Curtain Wall Construction In Shenyang Hang Lung Plaza

Posted on:2016-11-14Degree:MasterType:Thesis
Country:ChinaCandidate:W LuFull Text:PDF
GTID:2272330482955006Subject:Project management
Abstract/Summary:PDF Full Text Request
Building curtain wall is a kind of hanging on the walls of the structure frame of the lateral maintenance components. Composed of plank(such as glass、slab and so on), hanging dependent on building the main structure, do not assume the structure load of a maintenance structure. Glass curtain wall is a kind of building curtain wall, using glass as the plank. Suffered by its dead weight and wind load, earthquake effect, etc., anchor point to point transmission way to building owner framework. glass curtain wall because of its light weight, good day lighting, can heat bilges cold shrink, modeling art, fashion and other technical characteristics, become an integral part of modern building especially in high-rise buildings, is a sign of modern city.This article summarizes experience and lessons in the glass curtain wall engineering practice, from the construction organization, plate transportation, measuring unreeling, plate lifting, detail processing and finished product protection in this paper, the construction curtain wall project points, found in construction link, by using the methods of case according to the above construction procedures, grasp the key technical points, pay special attention to in testing water tightness and wind resistance, make the project to reduce construction safety risk, ensure construction period, the purpose of achieving good economic benefit, at the same time improve the quality of engineering, meet the requirements of technical specification and curtain wall engineering tests.The length of the construction project construction period will directly affect the earnings of the project, need to be in effective control of each link of time, for the above purpose, this paper takes Shenyang hang lung plaza, large glass curtain wall engineering test project as an object for research. Using project management knowledge, such as project decomposition(WBS), large glass curtain wall project in engineering project schedule management, optimize the time limit for a project, the effective control of the project schedule. Change from past experience on management mode, effectively shorten the project time, large glass curtain wall test management scientific and systematic. Project management has got more and more wide application in the construction project, this article hopes to test facility for glass curtain wall, the construction unit, the construction quality management of real estate developers to provide the reference.
Keywords/Search Tags:Glass Curtain Wall, Quality Control, Construction Management, Safeguard Measures
PDF Full Text Request
Related items