Cost Control Of Sewage Pipe Network Laying Project In Penglai Economic Development Zone

Posted on:2016-04-21Degree:MasterType:Thesis
Country:ChinaCandidate:Y SunFull Text:PDF
GTID:2272330482966200Subject:Project management
Abstract/Summary:PDF Full Text Request
In recent years, Penglai Economic Development Zone, with good geographical advantages, rapid development.206 State Road, a road, Guangzhou road. Beijing road. Tianjin Road, such as the main east-west road, Yinchuan Road, Shanghai Road, Nanning Road, Kunming Road, North and south, trunk road network has been basically completed, the entire region has opened a large development framework. With the continuous expansion of scale, large enterprises stationed, infrastructure such as water supply, power supply, transportation and so on have a greater development, only the sewage facilities seriously lagging behind urban development, resulting in environmental degradation, which restricts the further development of urban economy, and urban development goals are not coordinated, therefore, to accelerate the construction of sewage facilities is very necessary. Penglai Economic Development Zone, the sewage pipe network laying project started in March 2015, the period is 1 year, is expected to pave range West Zhi Road, Kunming Road in the East, north to the seaside road, South to Nanwang Industrial Park and 206 National Road laying sewage pipeline 45.97km, within the jurisdiction of all the sewage collection.In this paper, the method of earned value, literature review, research method, for the Penglai Economic Development Zone sewage pipe network project construction project, the project cost analysis and forecasting, to ensure the project control objectives. The earned value theory is applied to the actual engineering project cost control, analysis of cost deviation, proposed corrective measures, through strengthening the project cost control, to take effective measures to reduce management costs; improve the project cost control:strengthen construction personnel for construction technology and technical use of supervision and inspection, to ensure the correct use of construction technology, and to establish project cost financial control system, in the project implementation process to achieve good economic and social benefits, at the same time for the same type of construction project cost control to provide reference and reference.This paper is divided into seven parts:the first part is introduction;the second part is the theoretical basis of the research;the third part is the general situation of Penglai Economic Development Zone sewage pipe network laying;the fourth part is the project construction cost budget; the fifth part is the analysis of the cost deviation of the earned value method for the project construction period.;the sixth part puts forward the countermeasures and suggestions for the cost control of the project; the seventh part is the conclusion and prospect.
Keywords/Search Tags:sewage pipe network laying, earned value method, cost control
PDF Full Text Request
Related items