Font Size: a A A

Qing Lan Expressway Project LJ22 Tenders Responsibility Cost Management

Posted on:2016-09-03Degree:MasterType:Thesis
Country:ChinaCandidate:Z M PengFull Text:PDF
GTID:2272330482976637Subject:Project management
Abstract/Summary:PDF Full Text Request
The cost of management reform has become prominent and urgent to solve with the gradual improvement of the market economy and modern enterprise system. Survival of the fittest is the basic law of competition. Enterprise wants to survive and develop, it is necessary for staff to work hard for technical, and to take various measures to reduce production costs so as to provide high-quality, short time, low cost, safety and good product, which makes it remain invincible in the fierce market competition. The key of obtaining greater economic benefits depends on the ability of better controlling costs for enterprise. Therefore, it is particularly important for the construction enterprises to strengthen controlling of the project dynamic cost.Responsibility cost management is a more common modern cost management method, which advocated in recent years. It is one of the directions of inevitable development and reformation. The essence of this approach is that direct charges will divided into a number of responsible units by the construction unit, under the premise of the construction program have been identified, based on the scope of responsibility of each unit, quotas, standards and funding responsibility for the cost of preparing the budget settlement price, budget responsibility decomposes into every parts, which is contracted outwards, construction profit created should shared by enterprises and workers. This method of cost control can better mobilize the enthusiasm of employees and passion for participation, it is the whole process control of costs dynamic management.Qinglan highway LJ22 tenders section management is successful in using the responsibility cost management, it has treated as an model of experience exchange in the group company. And it is reported by "China Construction News" on topic of "cost management, the existing responsibility" as the successful management experience. This paper analyzes how to use the responsibility cost management in the highway project tenders LJ22 tenders section. Firstly, the basic theory are explained Qinglan for responsibility cost management system’s concept and significance. Then, the specific methods are introduced in using responsibility cost management, and the significance is pointed out. Running results are evaluated for Qinglan highway after using the responsibility cost management. Meanwhile, approach, methods are studied for staff to carry on and move forward the responsibility cost management. This paper combines the theory and practice, and can provides lessons for the construction enterprise in responsibility cost management.
Keywords/Search Tags:responsibility cost management, project, cost control
PDF Full Text Request
Related items