| This research topic of this thesis is based on the circulating fluidized-bed thermal power unit of ShanXi YouYu Power plant’s 9 MW energy reserve system,in response to the AGC frequency modulation project of ShanXi State Grid. It aims at investigating the installation of the energy reserve system on the thermal power unit,as well as realization and strategic optimization of energy reserve system with association to the fluidized-bed thermal power unit,responding to AGC’s dispatch operation of the state Grid.The purpose is to authentically realize the construction project.The research methods employed include theoretical calculation and analysis,analogue simulation of the optimization, and practical construction,test and operation of the project in combination with optimization of the actual revenue.The research focus is on solving the existing problems and difficulties respectively and offering effective and feasible blueprint for the design and practice of the construction technology,to satisfy the requirements of project implementation and operation optimization. |