A Study On The Deadline Of Priority In Compe Nsation Of The Construction Project Cost

Posted on:2015-02-24Degree:MasterType:Thesis
Country:ChinaCandidate:J N LuFull Text:PDF
GTID:2296330422472407Subject:Law
Abstract/Summary:PDF Full Text Request
The priority of claim in construction project period is necessary for the contractorto exercise the priority of claim in construction project. In terms of law within therelevant concepts, the contractor only grasp the project priority of repayment period,starting period of notice, duration of exercise standards and conditions, in order to betterin the complex field of the construction market in the protection of their rights. Thispaper selects the priority of claim in construction project period as the breakthroughpoint, to control the specific characteristics of stage of construction engineering, andbased on the research of construction project cost priority of legal system of claimperiod, then proposed that consummates our country the priority of claim inconstruction project deadline for comments and suggestions. The full text is divided intosix chapters:The first chapter: One case of the priority of claim in construction project deadlines.Mainly with a construction project cost gives priority to being with the typical case ofclaim period, leads to the field of construction projects in China, the contractor toexercise the priority right of construction project cost, the main problems in the exerciseperiod, such as the starting point and the duration of the term issues such as standards.The second chapter: The priority of claim in construction project definition. Mainlyexpounds the three different views of the concept of construction project cost priorityclaim and the academic nature of claim priority of construction project cost. Includinglien claims, priority claims and mortgage claims.The third chapter: The construction of price priority for repayment the right periodthe legislative situation and the main problems. Summarizes our current exercise on thecontractor the construction of price priority claim period of the current legislation, andspecific details of the period, such as a starting point for the use of the relevantlegislation in the practice of construction projects,The fourth chapter: The price of the construction project priority for repayment theright term international analysis. Mainly introduces the relevant provisions of theJapanese and international construction engineering "FIDIC contract" respectively onthe priority of claim in construction projects and deadlines, analyzed the legislation,execution and other characteristics, the construction project cost gives priority to beingperfect provision claim period provides beneficial enlightenment. The fifth chapter: Improving the construction project price priority period ofrepayment of the legal system. The specific problems that exist in the provisions of theperiod of the construction of price priority claim, elaborated on improving theconstruction project price priority claim the right to the starting point of the period, theurging the period contractor and construction project price priority for repayment of theexercise period methods and recommendations.The sixth chapter: Conclusion. Summarizes the main content of this paper andwriting method.
Keywords/Search Tags:Construction project cost, Rights of first refusal, Deadline, Problem, Perfect
PDF Full Text Request
Related items