Research On Cost Controlling Of JW Barracks Building Project

Posted on:2016-05-23Degree:MasterType:Thesis
Country:ChinaCandidate:Y ChaiFull Text:PDF
GTID:2296330467481426Subject:Project management
Abstract/Summary:PDF Full Text Request
Logistics construction gives the task of building barracks, especially for JW forces, thecamp in the existing part of the old barracks, the old barracks already meet the needs ofmodernization it forces. In order to effectively implement the "on accelerating theconstruction of modern barracks views", to further improve the work of the army officersand soldiers JW, living conditions, meet the strategic needs of modernization of the armybarracks, JW proposed barracks construction project. However, the JW army barracksconstruction funds accounted for only a small part of army annual budget, how to use lesscost to build barracks construction project? This requires the construction of barracks, makegood use of good cost management of funds, control.In this paper, project management, project cost management, project cost controlmethod as the basic theoretical foundation, analyze and research the theoretical foundationthrough the present situation of project cost management at home and abroad, Particularemphasis on the five kinds of cost control methods, one is the decomposition method ofWBS structure, and combine it with the OBS structure analysis research; Two is the timeschedule cost method, in each stage of construction cost is different, the cost is restricted bytime and project progress; three is the analytic hierarchy process, it is suitable for the projectwith staggered target system evaluation index; The four is the cost analysis method, it is akind of financial cost control method, cost, budget for deviation between the planned costand actual cost; five is the net value method, cost budget, it has completed the work bycalculating the actual cost and plan to get the budget cost schedule and cost plan deviationElucidation of the JW troops barracks construction project the actual situation ofbarracks construction project location principle and conditions and general situation of theproject were briefly introduced. According to the characteristics of the construction ofbarracks, specified barracks construction project cost control of the object and content, eachphase of the implementation of the project have different contents of cost control, thatbarracks construction cost control has its own characteristics, it has comprehensive, stageand specialized. In barracks construction project and project cost control characteristicsanalyzed one by one, points out that the factors affecting the construction of barracks projectcost control, cost control consciousness and concept, system, method and process.Aiming at the barracks construction project cost control existing problems, and furtherputs forward "JW barracks construction project cost control program. The system mainly fromfive aspects of. Principle of design, the design should follow system principle, theprinciple of the feasibility and the usability principle; the second is to propaganda andimplement the concept of cost control in the design and implementation of; three is throughthe establishment of the organization system and regime system to improve the cost controlsystem; the fourth is to project implementation method and control method of cost control ineach stage of implementation in the process of organization and management. In thedecision-making phase of the project, the project manager to select theoptimal scheme toprovide a good start for the follow-up of the project cost management. In the project designphase, designers focus on design, environmental design, building design and constructionplans, structure design factors. In the construction preparation stage, the leading group to doa good job of controlling cost and strict selection of subcontractors, strict management ofconstruction machinery and material approach test. In the construction stage, through thetechnology of cost control, financial methods, the project cost variance analysis method andcost control table to control the cost. Do the acceptance and settlement of audit work in thecompletion stage. Five is the construction project cost control flow chart. Acceptance andcompletion settlement audit should adhere to the principle of seeking truth from facts, inaccordance with the contract requirements combined with the actual construction costchange, the overall audit and the audit focused on combining method, the completion of thereview of the settlement.Cost control scheme design of smooth dependence in the control system of the cost tobuild and strengthen the sense of responsibility of the management personnel, this is thearmy barracks construction project cost control scheme for the implementation of thesecurity. The main measures are: one is to improve the quality, strengthen the sense ofresponsibility; the second is to establish incentive and restraint mechanism; the third is towork well the key links of cost control; four is good at in the dynamic process of project costcontrol. Five is the establishment of information system of project cost control. The six is toimprove the supervision and evaluation system of rewards and penalties.In barracksconstruction project, only the rational use of human, financial and material resources, toimprove the army’s use of military benefit, optimize the allocation of limited troop resources,in order to build in architecture, humanities, management, integration of modern barracks,will continue to promote the army’s modernization.
Keywords/Search Tags:The construction of barracks, Construction project, Project cost control, The controlscheme
PDF Full Text Request
Related items