Font Size: a A A

Research On Agent Construction System Of Primary And Secondary Safety Project

Posted on:2015-11-22Degree:MasterType:Thesis
Country:ChinaCandidate:X YangFull Text:PDF
GTID:2297330431466375Subject:Project management
Abstract/Summary:PDF Full Text Request
Because of the great Wenchuan earthquake of2008brings disaster, Centralunified deploy, the country invested huge material and financial resources to carryout the primary and secondary safety project. the self construction mode is unable tocomplete the project management works.The mode of agent construction system haveadvanced management method and Professional technology advantage, Agentconstruction system is the best solution for primary and secondary safety project.The first,basic concepts related to government investment project agentconstruction management mode is Clearly, the self construction mode and centralizedgovernment procurement modes are compared, we have a clear grasp of thecharacteristics of agent construction system. We Based on the Theoretical basis suchas property right theory, the principal-agent theory,administrative management theory,key issues of agent construction management mode is analyzed such as Scope ofapplication of agent construction system, The choice of agent, the fee of agentconstruction management, Project risk management, the above questiones drew amore reasonable conclusion.The second, project agent construction management mode is Performedfeasibility study, Reviewed project implementation process. In the process ofconstruction,We analysis management and responsibilities of government and the useof units in the agent construction system.The final,in the engineering example, we observe the progress of the project,validate the conclusions of the important problems, the practical problems in processare summarized, Analysis of the cause of the problems, Exploration of the causes ofcommon, For the two main aspects of regulations and process control problems,use oftheoretical analysis results, put forward proposals to solve the problem.
Keywords/Search Tags:agent construction system, government investment projects, primaryand secondary project
PDF Full Text Request
Related items