Font Size: a A A

Financial Feasibility And Risk Management Research On110kV HD Transmission Project

Posted on:2015-04-25Degree:MasterType:Thesis
Country:ChinaCandidate:Z H YangFull Text:PDF
GTID:2309330452960244Subject:Project management
Abstract/Summary:PDF Full Text Request
Power industry is the foundation to support industry, With the development ofsocio-economic level, the community power supply requirements are increasing.With theresidents’power reliability and power consumptionrequirements continues to increase, mustbe accompanied by a lot of investment in the construction of transmission facilities.Feasibility studies and risk research is an important part of the power transmission project.electricity production planning for social and economic development plays a very importantrole.The C city locate in northwest of Guangzhou. With the rapid growth of the localeconomy, along with the surge in demand for electricity. Now the C city is facing powershortage. The HL transmission project’s planning and design is in order to ease the tension ofpower shortage in the project area. Through the construction of the project will improve thelocal power supply and power supply reliability, reduce pressure on the local power grid. Playto ensure that residential electricity, the effect of promoting local economic development.Necessary to conduct a feasibility study on the project before the project investment decision,Technology is feasible in the project under the precondition, but also on project financialfeasibility studies, and the corresponding risk assessment and response analysis.According to the C city`s existing environment and HL project`s planning, Analysisproject`s estimated investment,financing plan, financial gains. Through the sensitivityanalysis to assess the impact of risk on construction projects, and puts forward thecountermeasures. Location and project profiles were analyzed projects, the construction scaleof the project, the construction of the rationality of the time and location were analyzed. Onthe project profitability, solvency conducted a quantitative analysis. Project NPV is¥11,318,800. Project Internal Rate of Return is10.88%. Project playback is10years.Theproject’s asset-liability ratio, interest coverage ratio, debt service reserve ratio is also lowerthan the level in the same industry projects. Then the factors affecting project benefits wereunivariate and multivariate sensitivity analysis sensitivity analysis of the key factors that mayaffect the project benefits were assessed to provide a certain amount of control ideas to ensurethat the project financially viable.Based on past experience in power transmission project and the actual situation of HLPower Transmission Project,risk of HL Power Transmission Project were analyzed to assess,classify and response measures. This article is based on the source of HL power transmissionproject is divided into technical risk, management risk and environmental risk categories. Impacts and response measures for different types of risk in HL project actually happenedqualitative analysis.
Keywords/Search Tags:Feasibility study, Financial evaluation, Risk assessment
PDF Full Text Request
Related items