Font Size: a A A

Feasibility Study On Applying BIM Technology In KT Group

Posted on:2016-01-03Degree:MasterType:Thesis
Country:ChinaCandidate:Z XuFull Text:PDF
GTID:2309330461975387Subject:Project management
Abstract/Summary:PDF Full Text Request
BIM technology has been in the western developed countries have been able to universal application, however, in our country began to become a hot issue in the engineering construction. With the increasing scale of engineering, structure form and type of more complex, especially, more and more super large and super high-rise buildings, so that real estate development enterprises are faced with tremendous investment and risk management. In order to solve the above problems, the application of BIM technology is the inevitable trend in the real estate development and construction.In this paper, through the SWOT analysis method, the analysis of the advantages and disadvantages of BIM technology in the application of the KT group, the opportunities and threats, clear out the BIM technology helps to real estate development and construction of the KT group, which can shorten the project construction, improve construction quality, save the cost, since the BIM technology in the development of real estate industry application is a trend, so in order to competitive advantage in the same industry, KT group must be the application of BIM technology.Because the KT group as a project oriented real estate development enterprises, and the leading application environment start from the construction stage, so the application of BIM, KT group strategy is to start from a single project pilot implementation of BIM technology, and then summarize the application experience of BIM technology in the KT group, the comprehensive promotion of BIM technology.This paper systematically studied the feasibility of application of BIM technology in the KT group, in the analysis of the pilot project feasibility of BIM technology, a detailed study of preparation, implementation scheme of technical and economic preparation, matching scheme, method on the research and analysis of KT group’s investments in software, hardware investment by analogy analysis, modeling, estimation of investment advisory services such as investment. Estimation on benefit evaluation of BIM technology is mainly researched in the ahead of schedule benefit, estimated that to improve the quality of benefit cost analysis, the implementation of the total benefit estimation scheme, studies show that the application of BIM technology can make the KT group obtained a larger income.The conclusions of this study showed that the KT group has the advantages of BIM applied and faces the opportunity and its application strategy should be the first single project pilot, and then gradually transition to the full implementation of enterprise. The proceeds from the investment perspective, KT group using BIM technology in a single project is feasible.
Keywords/Search Tags:strategic analysis, application value, implementation plan, economic benefits analysis
PDF Full Text Request
Related items