Font Size: a A A

Improved Research On Spare Parts Management System In GH Power Generation Company

Posted on:2016-08-04Degree:MasterType:Thesis
Country:ChinaCandidate:C CaoFull Text:PDF
GTID:2309330461986338Subject:Business administration
Abstract/Summary:PDF Full Text Request
As the electric power system reform, power enterprises gradually pay attention to enterprise operating costs, development strategy, the third industry, enterprise culture, introducing new equipment and equipment spare parts and other aspects of research and development. Based on GH power generation company as the research object, the application of advanced theory achievement, to research and analyze the enterprise equipment maintenance spare parts management system, to improve the level of spare parts management, reduce spare parts take up financing volume, for the purpose of the proposed for spare parts management, the optimized plan for the problem, the maneuverability is strong to expect through the study, for improving the management of the company’s equipment maintenance spare parts, is beneficial to enhance the production benefit, in the fierce market competition, safeguard and improve the company’s core competitiveness, is of great significance.Research methods of this thesis are:(1) the theory of reference phase, widely collect related information, to the essence, choose appropriate theoretical basis of this thesis research; (2) analysis of the present situation and the problems of existing management stage, the relevant data collection and analysis of the causes of current problems; (3) design optimization stage, according to the overall building activities, to the company’s existing data as an example to optimize the design of the scheme.GH power generation company’s spare parts management system are studied in this paper, found the company there are:(1) spare parts spare parts management, classification is unknown; (2) too much purchasing spare parts, spare parts procurement accuracy is not high, the spare parts money footprint; (3) the existing rules and regulations can’t work normally, spare parts procurement process is imperfect, the lack of staff training. These problems lead to GH power generation company’s lack of effectiveness in the management of spare parts, spare parts company present, the state of chaos, miscellaneous, which leads to high production cost. To analyze the reason it is concluded that:(1) lack of spare parts classification standards of science; (2) the lack of scientific forecast and reserve quota standard spare parts consumption.According to the principle of optimization, to optimize the plan implementation goal, the GH spare parts management optimization scheme of power generation company overall architecture for the purpose of building. From the classification method, control mode, safeguard measures in three aspects implementation contents and steps of design optimization scheme. Research is mainly focused on the spare parts classification, the consumption forecast and reserve control, safeguard measures and so on three aspects of improving measures. Designed for the company’s spare parts ABC classification standard based on hierarchical analysis, using the correct prediction of the trend "method" to determine the spare parts consumption and spare parts reserve quota standards, norms of quality management standards.In order to guarantee the smooth promotion of the optimization scheme, this paper carry out the standardized management of the whole idea, introducing the rationalization proposal, and through the nonconformities constraint management behavior, improve the management standard system and purchasing process, to carry out staff training, etc.This thesis not only to improve the level of GH power generation company spare parts management and reduced spare parts take fund has an important role in promoting, but also for the power industry also has the same type of power generation enterprises promotion and reference significance. GH optimization scheme of power generation company’s spare parts management system is to draw lessons from the theory of the lean management, improve the level of the spare parts management. At present, many domestic thermal power enterprises, many small factory, old factory lack the understanding of the spare parts management, promotion of lean management method based on the standard in the industry to improve the level of thermal power enterprise spare parts management is of great significance.
Keywords/Search Tags:power generation enterprise, Spare parts management, Spare parts classification, Inventory control, Improvement activity
PDF Full Text Request
Related items