Font Size: a A A

LiaoNing Vocational School New Dormitory Building Cost Management Research

Posted on:2016-02-15Degree:MasterType:Thesis
Country:ChinaCandidate:G L ZhouFull Text:PDF
GTID:2309330464462952Subject:Project management
Abstract/Summary:PDF Full Text Request
With the continuous improvement of higher education reform, higher education in our country in recent years, rapid development has made remarkable achievements; in this context of university infrastructure needs are also increasing. However, whether self-funded colleges and universities, state funding or bank loans, college infrastructure financing more difficult, while investment in existing infrastructure can not meet the construction needs more, based on this background, how the planned investment Institutions of Higher Education, colleges and universities to ensure the quality of infrastructure projects under the premise, but also can effectively reduce the construction cost is particularly important. Another large-scale enrollment in Chinese Universities ago, many colleges and universities in order to complete construction plans of investment projects, the project quality and the quality of the project as the focus of the construction of infrastructure projects expenditure control but not too much attention, resulting in a settlement over budget estimates exceeded the estimates, the budget estimates for the three out of the phenomenon beyond. Therefore urgent need to strengthen the university infrastructure cost management, so as to effectively promote the development of education.First of all, based on the project cost control of real estate research at home and abroad and further study of the current situation are, laid the theoretical basis for recommendations. After studying research results based on Liao Tie Zhi Yuan New student dormitory project, combined with the implementation of the project has been studied in the course of study, the real estate project cost management and cost control for an in-depth analysis of the current situation of, and identify the problems by building up a scientific and efficient management system, to correct these issues. In the article on managing the cost of the entire project, based on Liao Tie Zhi Yuan New student dormitory project, for example, specific examples analysis on project cost management of real estate, combining scientific theory and method, put forward proposals to improve the cost management of real estate project.
Keywords/Search Tags:University infrastructure, Construction project, Cost management, Countermeasures and suggestions
PDF Full Text Request
Related items