| According to statistics, in China’s current generation of various types of enterprises, the internal costs for expenditures in transportation, inventory management and expense needed to the maximum, which is used to manage the cost of inventory in recent years but there is a proportion rising trend. This requires enterprises to inventory control, to maintain its reasonable level, while gradually reducing the costs. This will not only solve the problem of their liquidity, but also encourage enterprises to further optimize inventory management. Therefore, on some issues in terms of enterprise inventory optimization problem is very important, inventory optimization ultimate goal is to reduce costs, many companies are now faced with the problem, Changchun thermal power plant is no exception.Based on the inventory status of power plant auxiliary materials in Changchun were analyzed and found Changchun Stock Situation auxiliary materials mainly due to the accumulation of heat and power plant equipment and spare parts as well as some existing problems, the author based on this premise, the analysis of its secondary material inventory management and supplier selected for analysis, combined with their theoretical knowledge, the use of ABC as well as vendor selection and equipment to solve the problem of accumulation of some parts, to optimize the management of its materials and inventory management status. Finally, the supplier evaluation in their choice of materials suppliers, assessed according to the performance of suppliers, select from more excellent suppliers to cooperate.The author of the auxiliary material inventory management, demand forecasting using scientific methods accurately predict its demand, and effective classification, according to the corresponding classification results, the targeted optimization of the different solutions and programs; At the same time, based on the basis of the above work, and ultimately for all types of optimization measures and optimization analysis to evaluate and select from the optimal solution.Study results show that thermal power plant in Changchun auxiliary materials inventory management and optimized science, as well as some equipment to solve the problem caused by the accumulation of parts, reducing inventory auxiliary materials enterprises, but also allows the company stock structure is more reasonable, thus reducing business risk, improving the company’s efficiency. |