Research On Schedule Management Of Large Chemical Engineering Projects In Company J

Posted on:2016-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:L GuoFull Text:PDF
GTID:2311330482467658Subject:Project management
Abstract/Summary:PDF Full Text Request
Large domestic chemical plant wants to improve competitiveness, it is necessary to improve its performance and reduce the cost, you need to the design of high quality, high level of design management.Engineering design phase is one of the most important stages in construction projects, affects the engineering construction project schedule. Engineering design progress management level of high and low, the stand or fall of management effect directly affects the economic benefits of engineering design units and reputation, but also can greatly influence the construction projects on schedule and put into operation and achieve the expected economic benefits. So the large chemical design schedule management has important practical significance, the need to use scientific project management theory and methods, analysis the influencing factors of design speed and cause, take effective management methods, strive to make the project smooth implementation during the course of design progress under control.In this paper, using the method of fishbone diagram through the brainstorming to find out related factors that affect the engineering progress, this paper tries to adopt this method, with the progress of the anticipated delay as a\"quality\", \"engineering design defects, from human, machine, material, method, ring five aspects analysis, influence project schedule of a variety of reasons, visual representation and its relative relationship, identify the reasons for 21, examination through practice and summary analysis, find the designers professional knowledge is weak, the lack of design schedule management process such as article 9 in. On the basis of the analysis above, using related theories and methods of project management, engineering design schedule management program flow is established, and a series of measures, and the application in a PE project implementation, In the end, the engineering design progress obtained the effective management, guarantee the engineering construction projects completed on schedule, realize the construction unit and design unit of the expected economic benefits and social benefits.
Keywords/Search Tags:Project management, Project schedule management, Schedule control, Work breakdown structure
PDF Full Text Request
Related items