Font Size: a A A

Optimization Research Of Construction Waste Management Process

Posted on:2017-03-15Degree:MasterType:Thesis
Country:ChinaCandidate:H JiangFull Text:PDF
GTID:2311330503467418Subject:Public administration administrative management
Abstract/Summary:PDF Full Text Request
Firstly, under the governance of the era, the relevant government multi-sectoral management make a brief literature review, update government administrative action is and the degree of social development is highly consistent, with the social complexity of the transaction to improve government administrative behavior presentation management from a single department to manage the development of comprehensive multi-sectoral then comprehensive management of cross-sectoral coordination, collaborative government came into being, multi-sectoral collaborative governance into the mainstream administrative environment, and as a basis for the background; and article of the government process reengineering elaborate theory, the theory of ideological and administrative processes in this ideological guidance of the optimization process steps specifically described and proposed administrative process optimization process is an important key points and optimization of administrative processes real problems; Finally,the city of Guangzhou as an example, combing the development and changes of Guangzhou City Construction waste management, according to the collected empirical data to discuss the pros and cons of Guangzhou city construction waste management business process, discusses the existing predicament of Guangzhou municipality on the administration of construction waste and multi-sectoral coordination of comprehensive management in business management process performance, which leads to the research content of this article: the use of administrative process reengineering influences the performance of construction waste management research, and how to build optimized multi-sectoral coordination in the process of waste disposal, construction management model.
Keywords/Search Tags:construction waste, administrative coordination, collaboration across departments, process reengineering
PDF Full Text Request
Related items