Font Size: a A A

Analysis On The Construction Technology And Quality Management Of GQBT Automotive Proving Ground High--speed Cycling Track

Posted on:2015-05-07Degree:MasterType:Thesis
Country:ChinaCandidate:L W HuangFull Text:PDF
GTID:2322330479998010Subject:Project management
Abstract/Summary:PDF Full Text Request
Automotive proving ground is a site which is special designed for testing automobile comprehensive performance, which can take a variety professional test to vehicles, providing a site which have a variety of special road durability test and performance test for new product development. According to incomplete statistics, the world has built more than 100 different types of automotive proving ground. And the auto industry in China started late, there are less automotive proving ground in china which can do the automotive integrated test experiment at present,moreover, commissioning tasks are in saturated state. In order to meet the demand of the development of domestic automobile enterprises, save the time of new car research and development, improve the efficiency of new car research and development, the paper has conducted the thorough research to the GQBT Corporation large comprehensive automobile proving ground.this paper designs a project management system of the GQBT automotive proving ground, making the project goals, determining the corresponding project management organization, and establishing the quality, time limit for a project, cost and safety management plan, make a analysis of the key and difficult project; with the engineering background of GQBT automotive proving ground high--speed cycling track, the characteristics construction technology and construction key points of high--speed cycling track is researched, compare The traditional subgrade filling with Foamed Cement Banking, the high--speed cycling track construction scheme was optimized. The Paper summarizes GQBT automotive proving ground high--speed cycling track construction technology, foamed Cement Banking construction scheme and asphalt construction scheme. According to the quality objectives of automotive proving ground high--speed cycling track, detailed quality objective management system and the quality assurance measures are drawn up, analyse the key link and quality common fault of Foamed Cement Banking quality control, to ensure the high--speed cycling track can achieve the goal of project quality management in construction quality.The paper hold the core of GQBT automotive proving ground project management, carry out the quality, progress, safety management, formulate reasonable scientific and feasible control project management plan, realize the project goal, has a good reference to the projects which have similar engineering project management.
Keywords/Search Tags:automotive proving ground, high--speed cycling track, Construction technology, quality management
PDF Full Text Request
Related items