Font Size: a A A

Research On Management Mode About Communication Integration Of District Power Supply Enterprise

Posted on:2016-04-07Degree:MasterType:Thesis
Country:ChinaCandidate:J Y YangFull Text:PDF
GTID:2322330482966412Subject:Project management
Abstract/Summary:PDF Full Text Request
Electric power communication network is to provide service for the grid network of dedicated to provide communication channels to ensure all kinds of production and management of information transmission, a smooth communication channel is the necessary condition to realize the intelligent control. Moreover, as information technology and push forward the construction of the project, the application of information system management throughout the enterprise, is the reliable support information system interaction and communication, the importance of electric power communication system in power system gradually, which requires power communications professional staff must have both high theoretical knowledge and skills, at present, the county electric power communication network, structure is relatively complex, on the one hand, the dispatching institution at the county level communications professional skill levels cannot meet the requirements of actual work. The diversity of communication equipment, on the other hand, causes the equipment operation maintenance function distribution in different operational units, cooperate with each other equipment failures and defects treatment process is relatively complicated,In this paper, we analyze the current situation of communication management in YX Power Supply Bureau, from the organization structure, personnel skills training, related processes, and information system four aspects of the problem, the paper makes the assumption that the integrated management mode of regional power supply enterprise communication scheduling is integrated, and the communication management of county level power supply enterprise is integrated into the communication scheduling.In addition, the ESIA management tool is used to optimize the existing process, in order to improve the efficiency of communication network fault processing, and simplify the management of process nodes, and reduce the management time and space.
Keywords/Search Tags:Electric power communication, Intensive, Standardization, ESIA
PDF Full Text Request
Related items