Font Size: a A A

Research On Construction Project Cost Control Of HYDRY Comprehensive Ward Duilding

Posted on:2017-05-12Degree:MasterType:Thesis
Country:ChinaCandidate:W C YinFull Text:PDF
GTID:2322330485980299Subject:Business administration
Abstract/Summary:PDF Full Text Request
With the implementation of the policy of universal health care in our country,the growth of the rigid dem and occurs by leaps and bounds in the medical market,Public ho spitals have entered medical resources expansion period.In recent years,promote the reform of public hospital compensation mechanism in China policy under the impact of public hospital profit space appear bluffs type narrowing,in order to realize the sustainable development of hospitals,most of the public hospitals do not hesi tate to borrow project construction under the condition of the poor financial situation.So,increasing the hospital construction project cost control research is very important.The cost control of construction project in order to be able to more effectively.This paper takes the construc tion project cost control of HYDRY Comprehensive Ward Building as the research object,through the decision-making stage and the implementation stage of the project,and discusses how to control the cost of hospital construction project.First of all,this paper summ arizes the construction project of HYDRY Comprehensive Ward Building,and an alyzes the factors that affect the cost control from the various stages of the project.Secondly,from the four aspects of the cost control of the organization system,system,method system,process system and so on,the design of construction project cost control system.Finally,combined with the effects in different stages of the project cost control cost factors and control requirements,from the decision-making stage and preparation of project proposal and feasibility study report on the preparation and implementation of design task book compiled,preliminary design,construction drawing design,recruit bidding,contract management,procurement management,construction management,engineering change management and project funds payment and claim 13 cost control process,system atically proposed HYDRY comprehensive ward building project decision-making stage and implementation stage cost control strategies.By means of information management,from the project decision-making stage to the project implementation stage,the construction project cost control of HYDRY Comprehensive Ward Building is studied.Not only for H Hospit al Comprehensive Ward Building Project of implementation of cost control is of important guiding significance but also to other hospitals,the cons truction unit,in the design and construction of the hospital construction project participation units also bring new idea of cost control.
Keywords/Search Tags:hospital construction project, cost control, system design, strategy
PDF Full Text Request
Related items