Font Size: a A A

The Design And Application Of The 4th Ecology Water Rising Project In Yichun City’s Wojiang Wetland Park

Posted on:2017-07-16Degree:MasterType:Thesis
Country:ChinaCandidate:Y Z F OuFull Text:PDF
GTID:2322330512957323Subject:Water conservancy project
Abstract/Summary:PDF Full Text Request
Ecological engineering usually refers to raise river low water,improve water ecological environment and water landscape and a new block of river water retaining,drainage ecological water conservancy project.This article only analysis for urban ecological landscape water out of the low level of water project.For forming the broad and deep green lake in the dry saeson,forming a broad lake,improve water quality,ecological landscape along the river and riverside water target,carry water for urban water ecological landscape engineering is generally controlled water conservancy project,and its carry water engineering itself also become a more beautiful scenery.In this paper,the design and application of ecological water project is studied baded on the 4th ecological water lifting project.Mainly do the following work:(1)Study on the application of ecological water lifting project.First of all,the application of ecological water carrying project,the characteristics of the work,the adverse effects of the surrounding environment and measures,and the type of gate dam are discussed.Then the 4th ecological water lift project is introduced,such as the necessity,the task,etc.(2)General layout of the project and design of main buildings.Firstly,gate dam site selection,power plant site selection,dam type selection,dam height width ratio,the foundation,and then determine the overall layout of the project,and the dam design,power plant design etc.(3)Design and application of Roller link type hydraulic automatic balanced concrete wichet.Firstly,the hydraulic automatic tilting gate concrete product selection,structure arrangement and working principle;and then study the hydraulic automatic tilting gate concrete adding of hydraulic hoist auxiliary control system;finally summarizes experiences of work characteristics and application of tilting concrete gate.(4)Design and application of bottom shaft hydraulic top drive turning plate steel gate.Firstly,the turning plate steel gate than selection,selected products;then the turning plate structure,working principle,concrete gate implementation;finally summarizes experiences(advise)of work characteristics and application of turning plate steel gate.(5)Engineering construction management.First of all,the project construction management model,and then design,construction analysis.The Wo River Wetland Park and the 4th ecological water lifting engineering with the upstream existing first,second,third water lifting engineering and riverbanks ecological cultural corridor,Zhuanyuanzhou,Waitan,Huachengyuan of the Yichun city wetland park,the central strip formed a cascade,showing a clear and beautful Yichun city.
Keywords/Search Tags:Ecological water rising project, Design, Application, Roller link type hydraulic automatic balanced concrete wichet, bottom shaft hydraulic top drive turning plate steel gate
PDF Full Text Request
Related items