Font Size: a A A

Research On Planning And Controlling Of H City Bed Expansion Project

Posted on:2017-01-05Degree:MasterType:Thesis
Country:ChinaCandidate:Y W ZhangFull Text:PDF
GTID:2322330518471337Subject:Engineering
Abstract/Summary:PDF Full Text Request
The prediction and control of the progress of the project is an important part of project management. In this paper, the h, D company of Metro backbone network layer expansion project as the research object, to predict and control the project progress in the implementation of the system analysis. To master the planning and control of the project schedule, the research of this paper will guide the project period how to save the project cost,improve the efficiency of construction, to meet the market demand, to complete the project on schedule.Firstly, this paper starts with the introduction the engineering situation of D company of H City metropolitan area network expansion project, research background and full analysis of the particularity of metropolitan core backbone layer, to develop in line with company D network construction project; according to the contents of the implementation of project WBS theory analysis; the project of human resources, the project life cycle assessment,is clear about the project implementation stage of the logical sequence, and calculates the detailed schedule planning, integrated the above several aspects to find critical path drawing network diagram, clear network important node and focus on routing, in the assessment of personnel capital as the foundation, optimize project implementation cycle, cost budget and human resources. Secondly, in the middle of this article will further explore the construction of D company based on the progress of the project planning and control. Research direction has the following several points: mechanism is established to control the progress of the project, the system model is set up to control the progress of the project, explains how to collect progress information and real-time monitoring method, using the characteristics of the Gantt chart to control the process of the whole project, illustrate the progress of the projects have an error cause and error correction, based on the method of S - curve of engineering overall sectional analysis. The finally, fused characteristics and requirements of D company network infrastructure, from doing a good job in the unit's coordination management, improve project personnel quality, perfect project quality inspection system, improve the regulatory system of project funds, improve the management of equipment of the project, project of security measures are put forward to raise the level of construction technology in six aspects,to ensure the smooth implementation of the project schedule...
Keywords/Search Tags:metropolitan area network expansion project, plan, control
PDF Full Text Request
Related items