| Construction project whole process cost management is a core content of construction project management, this is because the project cost management efficiency directly affects the economic benefits of the construction project. The construction project in the relevant units should do their work on cost management,each part of the funds to carry out strict control, and strive to achieve the rational management of the construction project satisfies the demand, this is the ultimate goal of the whole process of cost management of modern construction projects. In order to ensure the construction project cost control in a reasonable range, the need to continue to improve the construction project cost management of the whole process of production.In this paper we actual scene from the ZY group of a specific construction project implementation situation, introduces the general situation of the engineering construction project, analyzes the cost management problems of cost management in the whole process of construction projects in the project decision-making stage, design stage and implementation stage three stage, but also for reasons of various conditions were analyzed, and the implementation of the three stages of the project are put forward some reasonable suggestions. Because at present, there are still many problems in the whole process cost management of construction project in our country, so there are a lot of waste of resources in the construction of the project. The formulation of government rules and regulations guidance documents, cost management, cost management mechanism, the investment cost of the design quality design units do not pay attention to the construction contractor, the construction project are not perfect subcontract cost management of the whole process of cost management has caused very big effect. Make the construction project of the whole process of cost management of the purpose of detachment, healthy competition has been contained, the construction of the project participants to be active and creative. Only to make the whole process of construction project cost management in various stages to play its effective management, to ensure that the construction unit and the maximum economic benefits of each unit, and thus promote the healthy development of the units.Construction project cost management is the whole process, the whole system control process, this control is dynamic, and should be run through the whole process of construction project cost control of the whole process. In the project investment decision, design, bidding, contracting, construction and completion of any one stage,will firmly grasp the investment objectives, plans and the actual deviation at any time correction, the construction project investment control within the target range.Finally, this article through to the ZY group pile of clay membrane structure the actual implementation of the project as the breakthrough point for studying the analysis of the construction project whole process cost management problems and the reasons,for the construction of the whole process of project cost management to improve its purpose and provide a theoretical basis and policy reference and guiding significance of the operation suggestion. |