Study On Retreatment Method For High-fill Foundation Of Airports In Mountainous Regions

Posted on:2016-08-16Degree:MasterType:Thesis
Country:ChinaCandidate:C L WangFull Text:PDF
GTID:2322330536950186Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
In our basic establishment construction, airport construction is an important proportion. In recent years, the number of airport construction represents a rapid growth and has a wide distribution especially in west region, which is covered by a large area of mountain topography. In this context, high fill airport project comes forth and the existing challenges and problems have became the research hotspot in the near future. Meanwhile, for some high fill airport project, with low backfill quality, how to adopt the most efficient way to do the foundation treatment is still a difficult problem. Based on a small amount of extant research, we will do some intensive study on this key point. The paper will cut-in this problem, and do some research.With the rapid increasing of the high fill airport project, some research achievement have been done in this area.This paper will start with existence research, sums up the previous work and related theory. goes deep into foundation transformative rule and characteristic, and does judge to some factors which influence high fill foundation sedimentation. On this basis, we take a high fill airport which fill is finished but backfill is of a sort as an example, analyzes destruct matter of one period engineering systematically.and lucubrates chief problem of the second period engineering, According to the actual situation, dynamic compaction test and inspect is progressed under the energy levels of 2000kN?m or 5000kN?m to make sure applicability and correlation parameter in second period engineering field. Aimed at the confronting engineering problem, the paper establishes theory, constitutes corresponding settling measure, and brings forward economic and reasonable foundation scheme of the second engineering. Finally, after confirmation and implementation of the foundation treatment scheme, the foundation dealing effect is estimated by local distortion inspect circs of a certainty time.The research content in the paper is a part of research of high fill airport. The availability pin up depth and the carrying capacity in this backfill are definitude under the energy levels of 2000kN?m or 5000kN?m. And the scheme settles foundation treatment problem of the second engineering stage, avoids the austerity time limit and economy press caused by excavates filling and backfill again. And finally, got a effective results of the foundation treatment, The result of the result has great significant in improving the foundation treatment of the high fill airport and also supply an important referential value for similar engineering project in the future. will help to advance foundation deal level, and offer to reference for similar engineering.
Keywords/Search Tags:High-fill foundation of airport, Asymmetry foundation, Post-construction settlement, Dynamic compaction, Sedimentation observation
PDF Full Text Request
Related items