| Steel structure in China within the past decade has been rapid development in the rapid development of the steel structure is bound to the steel structure design,production and construction of steel structure put forward higher requirements,this time to strengthen the steel structure design,production and steel structure Construction of the field of new technology research has become a major trend in the development of steel construction.The development and application of BIM technology in the field of steel structure construction will inevitably bring great impetus to the development of steel structure construction enterprises,and it will bring the development of steel structure construction to the development of steel structure.The degree of information will also make the degree of refinement of the building management and integrated delivery level to achieve a great improvement,and ultimately to the steel industry enterprises to bring tangible profits.In this paper,Sunzhuang large-span pipe truss dry coal shed project as the research background,the long-span pipe truss engineering in the BIM technology applications on the following three aspects:First of all,the use of BIM technology to create the steel structure of the three-dimensional steel structure model,the Sunzhuang dry coal plant to deepen the design and drawings to deepen the design drawings for the late steel components processing and installation basis.Secondly,combined with the deepening of the engineering steel structure design drawings,the use of BIM technology on the production of complex steel structure to study and provide practical construction methods for steel structure processing production staff.Finally,the installation of steel structure is studied by using the visualization advantage of BIM technology.The installation scheme of steel structure is compared and Navisworks simulation software is used to simulate the construction.The construction scheme is optimized and the construction of steel structure has been carried out.Guidance.In addition,through the simulation of the lifting process of the key components under complex working conditions,the construction process is presented vividly,which provides reference for the formulation of the construction plan and the technical exchange. |