Font Size: a A A

Research On Squatter Settlement Rebuilding Project Based On Risk Management

Posted on:2019-02-24Degree:MasterType:Thesis
Country:ChinaCandidate:B YangFull Text:PDF
GTID:2322330566465786Subject:Project management
Abstract/Summary:PDF Full Text Request
At present,many towns and cities in China are carrying out renovation projects of shanty towns.It is also a major market resource for many real estate enterprises to survive and develop.Guojia guanzhuang shantytown renovation project is an important shantytown reconstruction project in weifang city.In the whole process of project implementation,even if the construction organization plan is very scientific and reasonable,it will still be accompanied by various risk factors.If the project risk management is not done well,it will result in great loss and disaster.A large amount of funds and various types of resources need to be allocated in the renovation project of gujia village shanty town.It requires strict requirements for the safety of construction personnel,mechanical equipment and construction vehicles.It is accompanied by the interference and restriction of various risk factors.Especially in the three periods before the construction of the project,it involves investment,progress,quality,organization,technology,safety,and environment and so on.There are different risks in every link,and once handled badly,it will affect the overall project and cause inestimable losses.Therefore,it is the key to ensure the smooth implementation of the renovation project of the shantytown.In view of the perspective of project risk management,this paper makes a thorough research on the project of shantytown reconstruction.Firstly,it introduces the theory and method of project risk management,and expounds the concepts and types of risk and risk management,the concepts and methods of risk identification,risk assessment,risk prevention and risk monitoring.Secondly,analyzed the ideas,steps and results of Guojia Guanzhuang squatter settlement rebuilding project risk identification in Hanting District of Weifang City,the process and results of the evaluation of qualitative and quantitative analysis,identification of the implementation of the project construction faces in the whole process of risk,construction risk,construction risk into sales,and after the breakdown of the sixteen two level risk index.Again,the application of AHP to evaluate Guojia Guanzhuang squatter settlement rebuilding project risk,calculate the weight of each of the two grade risk value,usingexpert scoring method to obtain the experts on the two risk impact on the overall risk of the project in the scoring results of rating,on this basis,using the fuzzy comprehensive risk level evaluation on the overall project evaluation analysis.Then,the sixteen risk factors influencing the weights of the sort found on the risk degree of the whole project risk index large main raw material procurement quality risk,construction enterprises lack the strength,the risk of breach of contract risk,the project funds are not in place,the risk of safety accident risk,and puts forward the main risk the factors of preventive measures.Finally,the design of the monitoring form and project risk tracking mechanism of Guojia Guanzhuang squatter settlement rebuilding project risk monitoring in Hanting District of Weifang City,the three aspects of risk monitoring steps as risk monitoring process a systematic,complete,think we should do risk data entry and analysis,storage,and to strengthen the professional supervision of risk.
Keywords/Search Tags:Squatter settlement rebuilding, Risk identification, Risk assessment, Risk precaution, Risk monitor
PDF Full Text Request
Related items