| Under the form of sports industrialization in China,the establishment of wushu combat ranking system is imperative.The author through the investigation of wushu combat competition situation in our country,found the following problems: wushu combat information is transparent,it is hard to get accurate information;Martial arts fighting alone,there has been no contact with other events,because of the different format,it is difficult to measure the comprehensive strength of athletes;Ranking system in while other projects have been developed using the mature,but martial arts fighting tournament is not integral format;No athletes access system,which leads to the athletes limit;Arrangement is not reasonable,etc.So building a set of perfect integral ranking system is very necessary for Chinese wushu combat project,it can solve the above problem.Ranking system adopts unified ranking method,the various types of martial arts competitions,in order to facilitate orderly management.Wushu combat system through ranking the way to release the system,and can make people more accurate,timely understanding of the athletes and all aspects of the information,create more opportunities for athletes,thus beneficial to improve the martial arts fighting overall level of the project,create a good atmosphere for wushu combat,promote the development of the project.The author a lot of investigation and study on wushu combat,in tennis,volleyball,and other projects at home and abroad for reference,the experience on the basis of the ranking system to analyzes the Chinese martial arts fighting games,build a set of suitable for Chinese wushu combat project development ranking system.In this paper,the results of the construction of Chinese martial arts ranking system are as follows: 1.Clear the importance of Chinese wushu combat ranking system,to the development of Chinese wushu combat events bring substantial change,the development of wushu combat has a positive role in promoting.2.Sort out the related factors of ranking system,details the system construction goal,construction principle and functional requirements.3.The regulations of the ranking system in detail,the entire system of data processing is one of important rules to follow when integral rules,this paper illustrates the integral distribution,the concrete calculation method,the update cycle.4.Design approach based on computer information system,to the construction of the overall ranking system,including the function of the system was illustrated with theoretical structure,with flow chart to illustrate the operation of system,the flow of data,processing process,such as the contents of the database in the form of form to illustrate. |