Research On Risk Analysis And Prevention EPC Project Contract Under The Perspective Of General Contractor

Posted on:2017-03-27Degree:MasterType:Thesis
Country:ChinaCandidate:H S XuFull Text:PDF
GTID:2349330485452722Subject:Technical Economics and Management
Abstract/Summary:PDF Full Text Request
In order to improve risk management of EPC projects contract of large overseas engineering,theory and practice had try to make a lot of efforts to motivate a series of research methods and tools to appear,and achieved research results.But there is still one area can be expand the space,namely the risk analysis with defense issues of EPC contract project,particularly in the general contractors' perspective.In engineering practice,Chinese EPC general contractor always with high enthusiasm in an increasingly competitive market,but widespread engineering contract risk management "loophole" exist,that is owners to take risksharing scheme is not conducive to the contractor,and the contractor can not accurately identify the hidden risk factors described above,and thus induce the owner and the contractor can not be positive and mutually beneficial cooperation.The very nature reason is that,Chinese general contractors' Engineering Contract Risk Awareness has been deeply influenced by FIDIC contract Thought,so t Chinese general contractors can not rationally identify hidden risks of contract at the compliance phase.Accordingly,actively explore further EPC project contract risks become theirs focus problems.In view of this,this study including the following five aspects:Collection Engineering Contract Risk quality material of reliable sources,take quantitative analysis for reliability and sample data.The traditional risk factors Recognition study on engineering contract lacks of consideration about the actual project situation,and source of sample data is uncertainty has restricted continue in-depth study.So the introduction of semistructured interviews with questions of method used to obtain the relevant substantive material is helpful.Identification of risk factors based on contract Grounded Theory.First,making a preliminary analysis of the traditional methods of risk identification project contract;Secondly,to carry out the identification of risk factors,including: political and economic class of risk factors,risk factors for type construction conditions,refer to the reference category of risk factors and performance ability of risk factors;Finally,describing the risk factors above.The introduction of matrix selection model contracts,making price contract basis EPC border risk analysis,based on the contract system for different risk factors.In order to ensure that this study sample selection and systematic science,introduced the matrix select select contract type contract and contract systems;according to the study sample has been selected,based on the state to compensate the perspective of risk analysis for the EPC project boundary price contract;border risk based on the analysis,the analysis of risk factors based on engineering contracts varied in different contract system of the present.EPC risk conduction.In traditional reference works contracts and amendments based on the study of risk prevention,drawing formula references quality management PDPC dynamic management method risk prevention research project contract;contract works by analyzing risks EPC project contract risks flow paths and routes,reveal conduction mechanism works contract risks;risk conduction mechanism according to the project contract,project contract to develop risk response strategies.
Keywords/Search Tags:EPC Project, Risk allocation, Compensation Contract Status, Contract Risk Pr evention
PDF Full Text Request
Related items