Studying Contract Risk Management In Chemical Engineering Building Project

Posted on:2011-08-11Degree:MasterType:Thesis
Country:ChinaCandidate:W H YangFull Text:PDF
GTID:2189360308952220Subject:Project management
Abstract/Summary:PDF Full Text Request
Project contract risk is nowhere absent within the project life cycle, for this purpose, the main body of a book specifically for domestic chemical industry builds the characteristic that the project contract manages, divide project contract risk into contract risk no under the control of and can contract risk controlling, and priority is face to face not bad the contract risk controlling develops identification , classification lists and the chemical industry construction project contract risk detailed list.And then lead into the risk estimate that matrix, identification and analytical result building project contract risk combining with chemical industry, risk is in progress to chemical industry project contract estimate that, describe to confessing that the control engineering bidding risk, measures a detailed list inaccurately , the high chemical industry construction project contract administration risk that plan implementation deviation , the safe accident lead to has been in progress combining with concrete case. The priority decision-making to project bid evaluation has carried out detailed demonstration research , have adopt many index overall evaluations improving to follow the bid evaluation being in progress , has interposed auxiliary calculation of formula , has made able form board and in EXCEL table in degree , culture confessing that goodness and badness bidding the stage risk administration is having direct impact to latent contract with the future risk,have verified simple and convenient , feasibility that the person handles , have accorded with chemical industry construction project characteristic and.And on the basis building the project contract risk estimate that's to chemical industry, as far as project contract risk controlling is total, charge moral hazard respectively severely , pay attention to confessing that six aspect has carried out detailed discussion with the administration improving contract administrative system , sharing risk rationally , reinforcing controlling that the contract carries out , taking the contract finality seriously bidding administration , building-up according to being engaged in the fundamental control method being hit by , controlling afterwards in advance ,build the case that the project contract manages combining with chemical industry, hope takes that the contract manages as "chain line ", Plan as a whole project administration safety , mass , rate of progress , the cost target are put into effect , are achieve thereby rational contract risk sharing responsibility, the smooth implementation of contract of guaranty composes in reply a finality.Chemical industry construction project contract risk has it's self some characteristics under the control of , risk distinguishes , analysis estimates that , the countermeasures basis is listed in only when being reinforcing a contract, the rates of agreement-honoring improving chemical industry construction project contract, are able to ensure that the project smooth is put into effect , expect that what the main body of a book does studies the practice to project administration helps to some extent.
Keywords/Search Tags:contract risk, risk analysis, multi-index comprehensive evaluation, risk prevention
PDF Full Text Request
Related items