Research On Risk Management Of Overseas Taipingjiang Hydropower Station BOT Project

Posted on:2016-11-21Degree:MasterType:Thesis
Country:ChinaCandidate:X L WangFull Text:PDF
GTID:2352330482466410Subject:Project management
Abstract/Summary:PDF Full Text Request
As a clean, Hydropower, renewable and new energy, has become the focus of China's new energy strategy, BOT project financing began in the 1970s, its main role is reflected in the project for the protection of the output, with a lower amount of project investment to obtain a large amount of project loans, BOT project financing is called "risk library", opportunities and risks, time has proved that the rational allocation and risk management is the key to the success of BOT project financing, the project should include a focus on participation in the implementation of various aspects of the core issues.Paper comprehensively analyzes the basic theory of BOT financing, the origin and development, financing methods and processes as well as the advantages and characteristics of BOT financing, in addition, for the risk management of BOT project development, research status and control at home and abroad were summarized and presented theoretical and practical significance of the research topic. Hydropower sources of risk analysis, risk identification, risk characteristics, risk factors and preventive measures of risk. Foreign investment risk higher than domestic projects, which is why the pre-construction feasibility analysis must be done so that the risk is reduced to a minimum.Combined with the authors' analysis of case studies for hydropower, the combination of theory and field, BOT project risk management not only rovided guidance for the project development, but also give a reference for foreign public infrastructure as well as coal, oil, energy and other resource extraction projects.
Keywords/Search Tags:Hydropower Station, BOT financing project, Risk recognition, Risk analysis Risk prevention
PDF Full Text Request
Related items