Font Size: a A A

Shoushan No.1 Cola Mine Entry Of Locomotive Transportation Scheduling Control System Research And Implementation

Posted on:2019-08-31Degree:MasterType:Thesis
Country:ChinaCandidate:F L ZhangFull Text:PDF
GTID:2381330599458177Subject:Electrical engineering
Abstract/Summary:PDF Full Text Request
The scale and output of coal mining in our country are increasing year by year.With the number of mining operation shafts and lanes is deepening and expanding,the number of locomotives and turnout points is more and more,and the traffic conditions become more complicated,which brings great inconvenience to the transportation management.In this paper,transport situation of Shoushan No.1 cola mine is investigated,with the promotion of IOT,computer technology and Internet technology,transport Monitor System for locomotives scheduling is built to solve the problem that locomotive running order disorder in Shoushan No.1 cola mine,so as to improve transportation efficiency,reduce transportation costs and ensure mine transportation safety.First,the research background,purpose and significance of the topic is introduced in this paper.Then the significance of locomotives scheduling and its research at home and abroad is described.Second,the existing problems in the scheduling of Shoushan No.1 cola mine are analyzed and the requirements of scheduling control are put forward.The functional requirements of the system are listed,including locomotive locating,remote control of switch,dispatching room and locomotive driver real-time Communication and automatic scheduling function.Third,the overall system is designed in according to the system's functional requirements.The structural design of the system includes locomotive locating subsystem,turnout control subsystem and wireless communication subsystem.The functional design of the system includes eight modules such as login module,locomotive locating module,turnout control module,dispatch module,wireless communication module,statistics module,fault management module and system management module.Then,according to locomotive transport scheduling control requirements,hardwaredesign that includes the structure and selection of hardware is carried out.Software design,including locomotive positioning module,switch control module and scheduling management module design is carried out.Finally,transport scheduling control system for Shoushan No.1 cola mine is developed.The system is successfully applied to Shoushan No.1 cola mine,and the results show that the system meets the functional requirements and runs stably.
Keywords/Search Tags:RFID, wireless communication, switch control, scheduling
PDF Full Text Request
Related items