Font Size: a A A

The Research Of Lancang River Cascade Hydropower Stations Bidding Strategy Under The Condition Of Electricity Market Trading

Posted on:2018-11-18Degree:MasterType:Thesis
Country:ChinaCandidate:Y ZhouFull Text:PDF
GTID:2382330518957977Subject:Project management
Abstract/Summary:PDF Full Text Request
With the deepening of the reform of electricity market,as the current largest hydropower renewable energy will gradually to become the market competition main body,the electric power industry in the future and occupies a very important position in the social and economic sustainable development.Market environment,water and electricity companies as the sole subject of power generation planning,is the formation of the market price and the recipient,consider the market factor,its target for scheduling and scheduling constraints are influenced by the market changes,increasingly complex problem optimization.How hydropower companies in electricity market reform,how to further study the relevant policies of the electricity market,analyze the bidding behavior of competitors,marketization of economic and reasonable bidding strategy is a important subject to research on the current.In this thesis,the author first introduces the research background and research purpose,significance,content,methods,and then expounds the game theory,operations research,and the theory of bidding project management related theory;Secondly introduces the domestic and foreign electric power market development and the basic model of electricity trading,summarizes the present situation of electric power market transaction and the existing problems,the theoretical knowledge for subsequent research has laid a solid theoretical foundation;Thirdly in the related research theory on the basis of the hydropower enterprise Internet bidding model are established and the solving method,and finally to cascade hydropower stations in the lancang river as an example,using the bidding model of power plant bidding strategy carried on the thorough research and analysis,put forward the specific bidding strategy,the competitor and market bidding behavior of power,put forward the scientific and reasonable practical bidding strategy.Through research,this paper can be concluded that in the current market trading rules under the marketization of the optimal bidding strategy model,analysis of competitors' bidding strategies under different conditions,realize hydropower enterprises to participate in market trading profit maximization,help hydropower enterprises in market transactions for their bidding strategy,to ensure that the power generation benefit maximization.
Keywords/Search Tags:Electric power market transaction, Game theory, Gascade hydropower, The bidding strategy
PDF Full Text Request
Related items