| Electric power production is one of the construction of the national economy and the development of the important infrastructure,while China’s current situation is increasingly serious energy shortage and environmental pollution,especially non renewable energy reserves of more and less,the energy crisis has seriously hindered the further development of economic construction.Mechanized construction management is becoming an important means for power group to ensure quality,reduce cost and gain benefit in engineering management.The main working procedures of the whole process of 110 kV line construction include material transportation,basic construction,group tower construction,erection construction,ground laying and so on.Due to the influence of terrain and traffic,there are some difficulties in the mechanized construction of the whole process of transmission line in mountain area.With the lake-Buha River 110 kV line project,research on construction scheme of the whole process of mechanization,and the implementation of summary.In view of the main working procedure and sub process,the design optimization measures are put forward to provide reference for the implementation of the whole process of mechanized construction in the same area.This paper mainly takes Qinghai Haixizhou Lake-Buha River 110 kV line project whole process mechanization pilot project as the research object,through the field investigation and survey of geological conditions and local mechanical equipment resources,analysis and Research on the rational construction period to ensure project quality and speed up the construction progress,save cost,reduce the construction investment of special design the disturbance of the environment and construction of special programs,in order to obtain good results in engineering management. |