Font Size: a A A

The Feasibility Study And Analysis Of The Relocation Of The Pressure Tube (Located In The New Town Of Wanlou) Of The Sewage Pumping Station In Shaoshan East Road,Xiangtan City

Posted on:2019-07-17Degree:MasterType:Thesis
Country:ChinaCandidate:X J HeFull Text:PDF
GTID:2392330566492484Subject:Engineering
Abstract/Summary:PDF Full Text Request
Xiangtan shaoshan road sewage pumping station pressure pipe(located in Wan Lou new town)moved to project belongs to the municipal infrastructure projects,construction project is located in xiangtan city of hunan province than building new town district,the original pressure pipe is located in xiangtan city new "a house five centers" construction projects and land for building new city,wan influence its development and construction,change needs to be moved,moved to change its projects are to meet xiangtan city "a house five centers" construction and building new town construction and development needs.Xiangtan shaoshan road sewage pumping station pressure pipe(located in Wan Lou new town)moved to the completion of project will be beneficial to building new town development and construction,expand the space of city development,promote the rapid development of economy.With thousands of buildings around the construction of the new town arterial road and the start of the piece of land consolidation,as the supporting facilities of water supply and drainage engineering,is to improve the ecological environment,improve the need of city flood control ability,is normally carried out of the city residents’ production and living,closely related to the vital interests of the people,in order to cooperate with the construction of building new towns,xiangtan shaoshan road sewage pumping station pressure pipe(located in Wan Lou new town)moved to engineering construction is imminent.The project adopts the scene investigation,visiting investigation,the method combining the theoretical analysis and field application of the status quo of the research,the local geography information collected,including meteorology,hydrology,the urban population,the local economic level,the urban pipeline,analyzes the present situation and urban land and comparing research category of related research status at home and abroad.,on the basis of present situation of the project,from economy,technology,promoting the construction of ease and construction time requirements of three aspects such as construction plan to conduct a comprehensive analysis and comparison,further to determine the construction route,flow calculation and the selection of pipe material,pipe diameter.To solve and prevent problems caused by environmental pollution,a set of effective governance system is constructed.Then it analyzes the implementation plan,environmental sanitation,health safety and energy consumption in the engineering construction,and then formulates environmental protection and energy saving measures.This study also has the investment estimation for the project to ensure that the project is completed smoothly and the benefit analysis and social evaluation has also launched a more specific,through the above study shows that the construction of this project is to implement than a substantial step controlling detailed planning of the new building.
Keywords/Search Tags:Road,Xiangtan
PDF Full Text Request
Related items