| With the rapid development of China’s railway,the construction of high-speed railway lines is becoming larger and larger,and passengers can enjoy more comfortable,convenient and efficient railway travel,making more and more people choose high-speed railway travel.However,during the winter snowfall,road and air transportation will cause a large number of passengers to rush into the high-speed rail,resulting in a passenger flow that is several times higher than the normal travel time.How to ensure the safety of passengers in railway station during the snowfall is the focus of safety work.At present,in the middle and small scale stations of the high-speed railway,the column-type canopy is often adopted,which cannot effectively block the snowfall on the platform.During and after the snowfall,the platform is wet and slippery.Moreover,due to the limited labor force in the station,the snow removal progress is slow,and it is difficult to effectively organize passengers to take and land,so it is easy to cause personal injury or delay driving or even cause driving accidents.The main purpose of this paper is to study how to use limited manpower to study the snow removal organization and passenger transport and landing organization at the column-high platform of high speed railway before,during and after snowfall,and put forward reasonable Suggestions for snow removal at the platform,so as to provide reference for high speed railway to conduct snow removal at the column-high platform efficiently and quickly. |