| The highway engineering project significant feature is the huge investment,long construction period,and the construction project has an internal relationship is very complex,and has a very extensive contact with external,so,in the presence of the highway engineering construction very much uncertainty,risk of no doubt is a significant highway project feature.Based on this,enterprises must fully understand the risk of highway engineering project,grasp the nature of risk,analyze the source of risk,predict the possibility of engineering risk,determine the degree of risk impact,and formulate engineering risk prevention measures.Based on this,the main contents of this paper are as follows: First,the main purpose of this study and the significance of this study are discussed.The risk management theory of engineering project is discussed and divided on the basis of clear research purpose and significance.The next is to study the risk identification of the construction project,and elaborate the method of the risk assessment of the building engineering.Then the risk prevention of construction project is studied.It is discussed from the aspects of organizational risk,progress risk,cost risk,quality risk and risk prevention.Finally,the case analysis,the ridge section of Fusong to ditch highway project as an example to study its risk management.On this basis,the Countermeasures of risk prevention of a project are put forward.In the process of construction of the project,in order to timely understand the whole project in the construction are facing various risks in the process of construction,and the risk identification and control,requires construction enterprises and the practical characteristics of the project,to carry out targeted risk management work,to develop more perfect risk management measures,reduce the project risk.At the same time,within the engineering project,the risk management system adapted to the characteristics of the engineering construction can be further constructed.In the risk management process,every construction personnel should be ensured to fully participate in it,and the effective control of project risk can be realized by actively applying new technology ideas and new methods. |