Font Size: a A A

Research On Multi-project Resource Optimization Configuration Of Communication Construction Enterprises Based On BIM

Posted on:2020-05-10Degree:MasterType:Thesis
Country:ChinaCandidate:S W LiFull Text:PDF
GTID:2392330578965825Subject:(professional degree in business administration)
Abstract/Summary:PDF Full Text Request
With the advent of information technology and the era of big data,communication technology has also developed rapidly.At the same time,it has also brought new development opportunities to communication construction enterprises.As the scale of operations continues to expand,the number of projects is increasing,and there are problems in managing many projects at the same time.Under the condition of limited resources,the traditional multi-project management model can no longer meet the multi-project management needs of enterprises.In the case of simultaneous construction of multiple projects,how to allocate resources is the core issue that needs to be paid most attention.How to stand on the perspective of enterprises and solve the problem of limited resources,the problem of unreasonable allocation of resources such as human resources and waste is significant.On the other hand,all industries are relying on new technologies to discover their undiscovered potential,and construction projects are no exception.In recent years,the state has vigorously advocated “Building information”.As a new technology in the construction industry,BIM has ignited a technological reform trend on a global scale.The practical application of BIM is also from its original 3D tools.Brought to the level of enterprise-level project management.In order to solve the problem of multi-project resource allocation faced by communication construction enterprises,this paper intends to introduce BIM technology into A communication construction enterprise,and analyze the current situation of multi-project management of the enterprise,and propose the resource allocation problem;through the literature related to BIM technology And the analysis of application value,summarize the applicability of BIM technology in communication engineering project management;in the context of BIM implementation,use AHP to prioritize each project in A project group,combined with traditional Network planning technology,optimize resource planning for the project group,and finally use the simulation and visualization features of BIM technology to track and analyze the construction progress and resource allocation of the project group,combined with the actual progress and project priority order.The project team is resourced to achieve the overall goal of the project “shortest duration,lowest cost,highest revenue”.In this paper,the research on the application of BIM technology to the multi-project resource allocation optimization of communication construction enterprises is beneficial to enterprises to allocate resources more rationally under the condition of limited resources,which has certain guiding significance for successful multi-project management of enterprises.BIM provides a reference for other aspects of communication construction enterprise management.
Keywords/Search Tags:Multi-project management, BIM, Resource allocation, Analytic hierarchy process, Time-cost optimization
PDF Full Text Request
Related items