| The internal combustion engine is the main supporting power for automobiles,motorcycles,agricultural machinery,engineering machinery,ships,diesel engines,geological and petroleum drilling RIGS,military engineering,general machinery,mobile and standby power stations.It must meet the requirements of the local laws and regulations and the engine OEMs terms of power,reliability,economy,emission,noise,weight and volume.At present,China’s internal combustion engine emission level,product quality and consistency requirements are constantly improving.In view of the requirements of the environmental protection policy,China has fully implemented the V standards for vehicle emissions.This policy is both a test and an opportunity for the internal combustion engine parts industry.In this great change of the industry,it has become the key to the development of enterprises to rapidly realize technological transformation and upgrading,adjust product structure,and improve the ability of market occupation.With the increasing demand for product quality,modern industrial production is becoming more and more sophisticated,system elements are becoming more complex,and production and technological transformation and construction cycles are gradually increasing,the difficulty and complexity of casting control management are increasing day by day.Therefore,how to improve the piston casting,reasonable design planning,procurement and supply of main and auxiliary equipment,construction management and other work level,so as to achieve the maximum economic benefits in the shortest time,has become the primary work of the internal combustion engine parts production and construction project management.Taking Chengdu galaxy power co.,LTD.piston casting technical transformation project as the background,research progress in the project plan and control,the introduction of C hengdu galaxy power co.,LTD.,on the basis of the basic situation of project construction,around the project schedule plan and control,with the standardization of the project management method,complete the various nodes and the milestone schedule,the activities of logic and time estimation,task decomposition of WBS and the responsibility matrix,network planning and schedule planning and so on a series of work,and will affect the project schedule is analyzed,using the knowledge of project management,A systematic study was conducted on the progress planning and control of the modernization piston casting technology reform project.This paper makes a deep analysis of the status quo of the progress control of the construction project of modern enterprises,finds out the existing problems,finds out the potential factors influencing the progress of the project,and makes an objective evaluation,which has certain reference and guiding significance for current piston casting project construction. |