Font Size: a A A

Research On Fine Management Of Urban Underground Comprehensive Pipe Gallery

Posted on:2021-01-15Degree:MasterType:Thesis
Country:ChinaCandidate:Y X PengFull Text:PDF
GTID:2392330632452114Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
General Secretary Xi Jinping put forward the general requirement that "urban management should be as delicate as embroidery." Urban underground integrated corridors are an important part of urban infrastructure,so it is necessary to achieve refined management of urban underground comprehensive corridors.In the existing urban underground integrated pipeline corridor operation and maintenance management system,a set of management schemes that reference refined management ideas have not yet been formed.The refined management ideas are introduced into the operation and maintenance management of urban underground comprehensive pipeline corridors,and they have been developed with promotion The refined management plan of urban underground comprehensive corridors of value has strong practical significance.This paper combines the ideas and theories of fine management with the characteristics of urban underground comprehensive corridors,analyzes the current status of urban underground comprehensive corridors,finds out the problems existing in the current management process of urban underground comprehensive corridors,and analyzes the reasons for the problems.Applying the idea of refined management combined with the above-mentioned problems,from the three dimensions of management organization,management system process,and management methods and tools,the pipe corridor body,the auxiliary facilities of the pipe corridor,and the environment and personnel are the starting points for the comprehensive management of urban underground Gallery has formulated a refined management plan.Through the pipe gallery monitoring system,360-degree non-dead-end monitoring of the integrated pipe gallery body and auxiliary facilities can be realized;The corridor alarm system can be used to monitor the operation of the auxiliary facilities inside the corridor,the environmental conditions inside and outside the corridor,as well as alarming the illegal invasion and triggering the emergency response system;Through the operation and maintenance system of the pipeline corridor,the working conditions of the front-line inspection and maintenance personnel of the equipment in the pipeline corridor can be grasped,and a 7 × 24 h inspection schedule is established to realize the all-weather refined management of the pipeline corridor;Manage all kinds of documents in the corridor and the process approval through the corridor office system,classify the internal documents in the corridor and realize cross-department sharing;by formulating rules and performance evaluation systems of various departments combined with the work situation of employees in the intelligent corridor platform to constrain the behavior of employees,the refined management of various staff members in the corridor is realized.Then,through the analytic hierarchy process,a refined management evaluation system for urban underground comprehensive corridors is established.Taking the urban underground comprehensive corridors in the southern canal section of Shenyang City as an example,the implementation effect of the refined management scheme is evaluated by applying fuzzy comprehensive evaluation.Aiming at all kinds of problems found in the evaluation results of the refined management scheme of urban underground comprehensive corridors,specific refined management improvement suggestions are given.The research results not only practice the refined management of urban underground comprehensive corridors,have formulated a set of urban underground comprehensive corridors with rich management ideas,and have promotion value.They also provide a reference for the development of urban underground comprehensive corridors in the country.And guiding significance.
Keywords/Search Tags:Urban underground integrated pipe gallery, Refined management, Program development, Fuzzy comprehensive evaluation
PDF Full Text Request
Related items