Font Size: a A A

Study On Special Construction Scheme Design And Intelligent Monitoring Of Tall Template Engineering

Posted on:2021-04-20Degree:MasterType:Thesis
Country:ChinaCandidate:Z KangFull Text:PDF
GTID:2392330647964086Subject:Architecture and civil engineering
Abstract/Summary:PDF Full Text Request
With the rapid development of China's national economy,the scale of various forms of reinforced concrete structure is expanding,and the application scope of template engineering is also expanding.Therefore,to improve the level of template construction and safety management,in order to effectively reduce the occurrence of template collapse accident has become an urgent problem to be solved in the current construction site.The main purpose of this study is to compare different template engineering safety calculation software,to provide reference for construction personnel to carry out more reasonable template engineering safety calculation,at the same time,BIM technology is applied to the preparation and construction of high template engineering scheme,to provide help for improving the construction safety management level on site.The contents and conclusions of this study are as follows:1.The application scope,function and design calculation method of three template engineering safety calculation software PMS,PKPM and Glodon are compared and analyzed.It is concluded that PMS has more advantages in engineering application scope,function and calculation parameter setting,PMS and Glodon calculation model selection is more flexible,and PKPM is better in complex scaffold modeling calculation and 3D model display.Finally,some suggestions on the use of the software are put forward,which can provide a reference for the construction personnel to choose and reasonably use the safety calculation software of template engineering.2.The Unified standard for safety technology of building construction scaffold GB51210-2016,Technical code for safety of steel tubular scaffold with couplers in construction JGJ 130-2011 and technical code for safety of forms in construction JGJ162-2008 are selected by using the safety calculation software of PMS,PKPM and Glodon checked the support scheme of the high template project of the new media industrial park project,analyze the difference of calculation results of different software and specifications,and used BIM technology to design the scheme of the high template project,including 3D field layout,selection of the scope of the high template project,engineering quantity statistics,construction schedule management and technical disclosure,safety training,inspection and acceptance,hazard identification and management,which improves the preparation level of construction scheme.This dissertation analyzes the application of BIM technology in the monitoring of high template engineering,and formulates the informatization monitoring scheme of template support system by using BIM technology.Through the analysis of construction monitoring data,it provides suggestions for the processing of monitoring data.
Keywords/Search Tags:Tall template, software comparison, BIM, scheme design, construction monitoring
PDF Full Text Request
Related items