Font Size: a A A

Risk Research On The Reformation Project Of N Company's Microwave Expanded Stem Silk Production Line

Posted on:2020-05-16Degree:MasterType:Thesis
Country:ChinaCandidate:N D WangFull Text:PDF
GTID:2431330596497315Subject:Business administration
Abstract/Summary:PDF Full Text Request
With the development of China tobacco industry and the increasingly fierce market competition,cigarette industrial enterprise and related accessories supporting enterprises to adapt to the needs of the development of the industry and their own from product quality,enhance the enterprise core competitiveness,and the authors efficiency perspective,start production line technological transformation projects.This project has the characteristics of high investment and large difficulty generally,there are multiple before and after the project in risk(containing multiple stages,multiple levels),have put forward higher requirements for technical transformation project and the challenge.Therefore,the technical renovation project of risk management is very necessary,it is great practical significance.Based on N corporation the microwave expanded stem production line technological transformation project as an example,research on the risk management,building includes risk identification,risk assessment,risk response and risk monitoring and control of risk management procedures.Firstly microwave expanded stem production line process decomposition,according to the microwave expansion section,pelleting and cutting wire section,as well as particle stem segments of a total of four key working procedure,and combining the method of questionnaire and Delphi method to the project of the part or the whole key risk identification and analysis,to determine which of the four main risk factors: technical risk,management risk,quality risk and environmental risk,and then using the hierarchy analysis method and expert scoring method for project risk assessment,factors affecting the project is the biggest risk is technical risk,and calculate the overall risk of the project level is moderate,the project is feasible.Finally combined with the actual situation of the project,for each risk specific measures are put forward.This article introduce the modern concept of project risk management of tobacco industry technical transformation projects,through the theory as microwave expanded stem production line technological transformation projects to provide the necessary support,and made the beneficial exploration to the cigarette industrial enterprise technical innovation project,the tobacco industry for the future technical renovation project to provide certain reference and guidance.
Keywords/Search Tags:Tobacco, Microwave expanded Stem, Production Line, Transformation, Risk Management
PDF Full Text Request
Related items