Feasibility Study Of LYG-GX Thermal Power Phase I Construction Project

Posted on:2018-11-17Degree:MasterType:Thesis
Country:ChinaCandidate:S H JinFull Text:PDF
GTID:2432330602959389Subject:Project management
Abstract/Summary:PDF Full Text Request
Located in the abdomen of East China power grid,Jiangsu power grid is an important part of East China power grid.Since recent years,the economy of east China and Jiangsu has been developing rapidly,and the load of power grid is growing continuously..Xuwei district is positioned as a national circular economy demonstration zone,Jiangsu's new coastal industrial base,east and west regional cooperation demonstration zone.According to the "lianyungang urban heat and electricity generation plan(2011-2015)"(hereinafter referred to as "heat and power generation planning")adopted by the development and reform commission of Jiangsu province.The principle agrees to integrate new haicheng during the planning period,Keep two heat sources,The seaside new area and lianyun city reserve a heat source point,The south wing new city has two heat sources,Installment construction.Xuwei new area is in the south wing new city is lianyungang city to expand the port function,Important areas for implementing coastal development strategies,Currently,enterprises in the region are implementing construction.Thermal power plants and small boilers are currently not centrally located in the area.Because it is far away from the other heat sources in the surrounding area,There is also a considerable heat load in the new area.so,Planning and construction of the only CHP project in xuwei new district,As the important public works that xu wei new area needs to develop first,It's just around the corner.This article is in this context,Theoretical knowledge of feasibility study,The feasibility of the phase I project of lyg-gx thermal power was analyzed.The thesis is divided into six parts:Firstly,the background and significance of the topic are introduced,Study the contents of the study;Secondly,the relevant theories and research contents of feasibility study are introduced;Then the demand analysis of the project is discussed in detail,including thermal load and grid load demand analysis;Then,the overall plan of the project was listed,and detailed introduction of the layout,installation plan,heating network and access system of the project was introduced;Then the project was evaluated through economic analysis,sensitivity analysis and risk analysis.Finally,the feasibility of the project is summarized,and the basis for the decision of this project is provided,and it can be used for reference for the construction of similar projects.
Keywords/Search Tags:Feasibility analysis, Thermoelectric project, Technical solution
PDF Full Text Request
Related items