| The reconstruction and construction project of shantytown itself is a major task of political and people’s livelihood construction,and it is often accompanied by the characteristics such as the great difficulty in raising funds for the shantytown renovation project and the great amount of investment and use of funds.,many factors affecting the quality of construction,and relatively long construction periods.Both its initial site selection and its subsequent planning,design and construction,and completion of the project to its formal use,there may be various unpredictable factors and risks throughout the project construction process,such as various natural and other social disaster risks,and technology application risks,Management risk,production safety management risk,economic benefit risk,etc.If on various risks encountered in construction is not timely effective identification,analysis and control,so these risks and influencing factors under the condition of a certain amount of time and interaction,,which will directly make progress in the reconstruction and construction projects of shanty towns.Delays and severe overruns in investment costs can even lead to the failure of reconstruction projects.During the planning and implementation of the shantytown-based renovation and construction project,various risks and influencing factors may be involved,and the interaction of various risk factors will have an impact.After comparing and analyzing and summarizing various risk evaluation methods,we A multi-level risk analysis method was selected for risk evaluation,but because the calculation results of this risk evaluation method are scattered,the results of comprehensive analysis and evaluation of various risk factors for the entire shantytown project cannot be obtained in time,so the combination of fuzzy The fuzzy AHP model established by the comprehensive evaluation method can achieve better results.Based on the in-depth risk management case analysis of The project in Xiaoliu Village,Dezhou city,combined with various management risk theories,this paper profoundly analyzes the risk problems faced by the project in Xiaoliu Village,and through the comparison of the status quo of shanty town research at home and abroad,introduces the risk management technology research routes and methods and research content,etc.Through the application of systematic ah P and fuzzy comprehensive risk assessment,the importance of the potential risk index of engineering construction projects is comprehensively evaluated at the ah P level,and the final risk assessment method and result are obtained through the analysis.This paper briefly introduces the dezhou Xiao Liu Village shantytown reconstruction engineering construction project of the main risk factors and management methods,and according to the risk characteristics of different construction stages,put forward the construction stage of dezhou Xiao Liu Village risk shantytown renovation project specific analysis of the potential risk factors and management strategy.It also analyzes the effect and importance of the risk management in the construction stage of the project after the implementation of the shanty town risk management in Xiaoliu Village.Research and conclusion in this paper,the main problem of this paper are as follows: First,the management of house demolition and resettlement should be led by relevant local government departments.Therefore,in the planning and implementation of the shantytown renovation and construction project in Xiaoliu Village,Dezhou City,Shandong Province,great attention must be paid to the demolition and resettlement of the houses in order to effectively promote the promotion of the shantytown’s dilapidated house reconstruction in Xiaoliu Village towards a virtuous circle.Direction of development.The second and more important is the effective prevention of project risk avoidance and identification management mechanism,which has made the internal control and management of project construction and management in Xiao Liucun achieve obvious results,and the level of project management has also been greatly improved.Third,the project risk identification mechanism for the reconstruction of shanty towns in Xiaoliu Village can be avoided and effectively prevented. |