| In recent years,with the rapid development of China’s domestic construction industry,the market increasingly active,competition is increasingly fierce,resulting in various construction projects in the field of the participants had to improve their comprehensive ability,which also includes management and risk control ability.For a building decoration project,if you want to make the project completed on time,including management staff has a decisive position.But because many management personnel is not in the daily project management to give enough emphasis on project risk management,which caused a lot of unnecessary,can avoid the loss.General building decoration engineering project has the following features:large amount of material consumptions and indefinite period and involve relatively extensive,single process strong,participate in large number,coordination requirements are relatively high.Because of these characteristics make the every stage of the project,including feasibility studies,survey design,construction and project completion acceptance,etc.,are inevitably accompanied by all kinds of unpredictable risks.If not in time for these make reasonable and effective risk management plan,it is likely to make suffered heavy losses in the process of construction of the project.These are all we don’t want to see the project participants.So,we should strengthen and pay more attention to the practical application of risk management in daily work study at the same time,the development and improvement of the engineering project risk management theory,is a very important practical significance.The purpose of this study is to enhance project management workers on the project’s risk management consciousness,improve the social parties attention to risk management.To save construction of resources,reduce production costs,improve the survival rate of the project,reduce the possibility of a construction project in all kinds of risk,and make great efforts to reduce the unnecessary loss during the construction process of purpose.Project participants such as reasonable and effective ground application system of risk management theory,will help the project smoothly and the project implementation in the final success.And also in the process of practice can continue to develop and improve the risk management theory and explore the new management method.This article from the current status of risk management both at home and abroad lead to the development of domestic risk management,and points out the shortage of present domestic in risk management,focus on the risks and risk management made a detailed and comprehensive introduction.Full text in combination with engineering example,the theory is applied in the actual engineering project construction,describes how to against risk in specific projects to develop effective and reasonable control decisions.And to make a full set of relative to the overall risk management analysis and summary. |