Font Size: a A A

Study On The Influence Of "Camp Increase" On Construction Machinery Utilization Fee And Its Countermeasures

Posted on:2019-08-31Degree:MasterType:Thesis
Country:ChinaCandidate:J Q HuangFull Text:PDF
GTID:2492306734984679Subject:Management Science and Engineering
Abstract/Summary:PDF Full Text Request
The construction of hydropower project not only plays an important role in adjusting the energy structure and improving the ecological environment,but also occupies a very important position in the national economy.At present,there are many researches on the influence of "increase" on hydropower industry,including the influence of "increase" on hydropower industry,hydropower construction enterprise,hydropower project cost and so on.However,such studies lack a systematic study of a particular aspect of hydropower engineering.In this paper,according to the relevant policies and regulations of the "increase",this paper analyzes the influence of the "increase" on the construction machinery use fee,so as to provide reference for the hydropower related enterprises to reduce the construction cost.Firstly,this article sets forth the topic’s basis and meanings,proposed research significance and methods,and summarizes the application of domestic and foreign scholars in the value-added tax,the development of pricing methods,and the “business-to-business”increase in the construction industry,hydropower companies,pricing system The status of research on the impact of such aspects.Based on the circumscription and teatures of the hydroelectric power,introduced the business tax and value-added tax,the theory of water and electricity engineering cost and the theory of value-added tax are introduced.Secondly,according to the characteristics of the cost of hydropower project,the paper studies the influence of the "increase" on the construction machinery use fee,from the two aspects of the choice of mechanical equipment and the optimal configuration of mechanical equipment,the paper analyzes the " The choice of access methods and the allocation of mechanical equipment and other issues.Finally,through the analysis of the calculation method of construction machinery use cost of hydropower project,the paper puts forward the method of reducing the construction service fee and strengthening the cost control method after "increasing the operation",and providing some reference value for expanding the project profit space.
Keywords/Search Tags:Business tax reform VAT, Hydropower project, Construction machinery use fee, Cost Control
PDF Full Text Request
Related items