Research On Cost Control Of Flood Control Project In Xiong’an New Area Of Anhui Water Resources Development Co.,Ltd.

Posted on:2022-11-08Degree:MasterType:Thesis
Country:ChinaCandidate:X SuFull Text:PDF
GTID:2492306758997659Subject:Accounting
Abstract/Summary:PDF Full Text Request
Nowadays,with the continuous development of society,residents have more and more diverse requirements for the functions of water conservancy projects.In the planning period of a water conservancy project,it is necessary to consider the flood control management,water conservancy and power generation,irrigation of farmland,waterway navigation,river regulation and so on.A very important index of water conservancy project in the planning period is the construction cost of the project,which directly determines the benefit of the project and the technical quality of the project.At this stage,China’s cities are developing faster and faster.Everyone’s awareness of environmental protection is increasing,and there is more and more demand for clean energy such as water conservancy.Due to China’s special geographical conditions,the distribution of national hydraulic resources is also very uneven,which makes more requirements for the functions of water conservancy projects and higher requirements for project cost control.In the past,the construction enterprises of flood control projects paid attention to the disclosure of cost control,which is prone to the phenomenon that the cost exceeds the budget and leads to losses.An important reason is that most flood control projects are led by the government.With the development of society and the improvement of technology,there is an urgent need for a cost control method adapted to the new era to solve the problem of difficult cost control.Taking the cost control research of flood control project in xiong’an new area of Anhui water conservancy company as the object,the project is located in baiyangdiankou of Baigou diversion River from Anxin county to Rongcheng county.The project is 35 kilometers long and is in xiong’an new area.The main engineering functions include: the newly-built embankment and the heightening and thickening of the original embankment according to the 200 year return period flood standard,the ecological landscape engineering around the embankment,the transportation hub engineering,water and soil and environmental conservation,and the houses and equipment for construction management.The project will strengthen the development and construction of water flood control supporting facilities in xiong’an new area and the combination with wetland ecological environment,organically combine urban development and construction,and realize the beautiful situation of people and water dependence and harmonious integration in the new area.Based on the actual water conservancy project,this paper starts from the principle and significance of project cost management,the specific situation of cost control in the construction process of the actual project,and according to the current situation and existing problems of water conservancy project cost management in xiong’an new area of Anhui water conservancy,the organizational structure is not perfect,the process of cost management is not standardized,the management mode is old,the vision of cost management is short,lack of timeliness and many other practical problems,The design puts forward targeted strategies,designs and decomposes various works of the project,defines the responsibility contents and results of various works,formulates the cost plan of the project,designs targeted cost estimation and budget scheme,ensures the effective implementation of the design scheme through organization guarantee,system guarantee and process guarantee,and implements the improved cost control scheme in strict accordance with the system,It can effectively deal with the problems of lax cost control and poor management methods encountered in the project,improve the efficiency of fund use,help the enterprise realize the target income and objective economic benefits of the project,help the enterprise develop with high quality,and ensure the safety and Under the premise of high requirements for quality and construction period,obtain the expected economic benefits,adapt to the requirements of new water conservancy project construction cost and management in the new period,and provide theoretical and practical reference for further exploring and developing water conservancy project cost management.
Keywords/Search Tags:Water conservancy project, Xiong’an new area, Cost control
PDF Full Text Request
Related items