Research On Project Cost Control Of A Construction Company

Posted on:2023-03-12Degree:MasterType:Thesis
Country:ChinaCandidate:X TangFull Text:PDF
GTID:2532307070470284Subject:Business management
Abstract/Summary:PDF Full Text Request
The development of the construction industry is facing many challenges,but also ushered in many opportunities.After the gradual acceleration of the development of the construction industry,the competition between the industries is obviously intensified.Under the market economy system,the most important thing for enterprises to obtain more economic benefits is to adopt scientific,reasonable and feasible project cost control scheme.However,the characteristics of the construction industry affect the accounting treatment of the project cost expenditure is included in the scope of the enterprise’s main business cost expenditure,so for the construction industry to control the cost,it is very necessary to study the construction project cost.This article first to the related research achievements of domestic and foreign construction enterprise project cost control,review and summarize to grasp the construction enterprise project cost control theory,selection of A construction company as the research object,analyses the project cost control,to the project cost control system as A starting point,exploring the company project cost control method and control process.After analyzing the cost structure of A construction company,the cost control process of the company is taken as the guide to analyze the bidding decision,preliminary management,completion settlement and other related stages of the process,so as to find out the problems existing in the project cost control of each stage: The project cost control system in the early management stage is not perfect,the project personnel in the construction stage have weak consciousness of project cost control,and the final account of the completion stage is not timely settlement work.Then,based on the project cost control methods previously adopted by the company,targeted improvement suggestions are put forward: to improve the project cost control system of the company in the early stage,to strictly control the main cost expenditure in the construction stage and to timely settle accounts in the completion stage.Finally,it puts forward the safeguard measures in system,organization and technology.This study aims to develop a scientific and reasonable project cost control optimization scheme for A Company,hoping to increase the company’s economic benefits,so as to achieve the goal of profit maximization.In addition,the research results are expected to provide a reference for the same type of construction companies to control project costs.20 Figures,22 Tables and 60 References...
Keywords/Search Tags:Project cost control, Bidding decision, Pre-management, Completion and settlement
PDF Full Text Request
Related items