Font Size: a A A

Geological Engineering Application Of Post-project Evaluation Theory

Posted on:2011-06-09Degree:MasterType:Thesis
Country:ChinaCandidate:B L WuFull Text:PDF
GTID:2120360305994507Subject:Geological Engineering
Abstract/Summary:PDF Full Text Request
With economic globalization and regional integration, more and more of the building construction enterprises to go abroad to participate in international construction market competition, from the initial labor only contracting, the development of today's general contracting, construction has become a great power in China, and those development process without extraordinary twists and turns, both successful experience with some lessons. Selected current geological engineering project management process in general problems, paper use of post-project evaluation theory and methods of research and analysis, proposed to solve these contradictory ideas and suggestions, discusses post-project evaluation procedures and established the corresponding evaluation model.(1) Optimization of geological engineering project management strategy.①egulate bidding activity.1) Continue to improve the qualification system and filing system, regulate bidding procedures;2) Establishment of a more scientific and reasonable evaluation method to reduce the impact of human factors; 3) Improving administrative supervision and management of the bidding mechanism, strengthen the supervision over law enforcement; 4) Strengthen the performance of contractors awarded the contract after the supervision and management, strictly control design changes.②Strengthen the security management.1) Publicity and education, strengthen safety management; 2) Perfection of the safety management system; 3) Improve and perfect the mechanism for training construction workers;4) Implementation of quality management of construction safety measures.③improve project quality management operation mechanism.1) Optimize project management organization, to improve the quality of project construction personnel; 2) Maintain a strict quality control of raw materials;3) Dynamic control of the implementation of project quality objectives;4) Efforts to enhance the core competitiveness of construction enterprises.④Actively promoting the construction project risk management system works to reduce project risks.(2) Post-project evaluation methods and evaluation elements.①Post-project evaluation methods include:logical framework, statistical prediction, comparison principle-whether the comparison method, decision tree.②Post-process works evaluation:the project objectives→project decision→project design→project preparation→project construction→project operation and maintenance.③Post-evaluation of the impact of projects include social impact assessment and environmental impact of post-post evaluation.(3) continuous evaluation and risk analysis①Sustainability Assessment:The first refers to projects where the investment company or the impact of sustainable development, the second refers to the project on the social sustainable development.②According to the project implementation process indicators for the evaluation of factors to build a comprehensive assessment of the project three-dimensional structure map, based on selected indicators and building up an assessment index system, applications using the analytic hierarchy and fuzzy set transformation to establish the principle of mathematical evaluation model.
Keywords/Search Tags:Geological project, Project management, Theory of post-evaluation, Applied research
PDF Full Text Request
Related items