Font Size: a A A

Research On Schedule And Quality Control For Palisade Structure Reconstruction Project Of Cold-rolled Pickling Plant

Posted on:2012-04-22Degree:MasterType:Thesis
Country:ChinaCandidate:Q XuFull Text:PDF
GTID:2181330467464886Subject:Project management
Abstract/Summary:PDF Full Text Request
The cold-rolled process is the most complex production technology, the most various process and the most stringent process of quality requirements in the whole process of BG Co., any one of the error in detail will directly affect the quality of products, and pickling process is the whole production line of the cold-rolled mill process, the first key working procedure, also ensure that the quality of products of the foundation. Because of the special cold-rolled pickling production process and structural characteristics, in long-term of production using process, the factory building structure especially palisade structure will appear more and more serious corrosion damage problem, and thus affecting the workshop production environment directly. In order to ensure the safety of the structure of the cold-rolled pickling plant and the using function, to ensure normal production requirements of the environment, it is necessary to reform the palisade structure of cold-rolled pickling plant comprehensively.In this paper, the palisade structure reform project for cold-rollied pickling plant, from the project scope, organization structure and production process outlines, plant structure design form, factory building palisade structure corrosion situation were summarized, based on this cold rolling pickling workshop focuses on analyzing the theory of corrosion palisade structure and the reasons, and puts forward the reform project technical plan, the progress and quality of the project plan and project implementation and the main points of quality control, and the implement the whole process and quality control of the progress of research and exploration. The results show that the proposed project progress and quality plan not to halt production circumstances is fit for the requirements of the organization and implementation, and summarized the research progress of the project implementation and the quality control method and main points more accord with project characteristic, and concrete, practical, to ensure the realization of the project goals for future other enterprise similar transformation project of management, and provided the beneficial reference and the model.
Keywords/Search Tags:pickling workshop, palisade structure, schedule management, quality control, plan, implementation
PDF Full Text Request
Related items