Font Size: a A A

Construction Project Management, Control And Application

Posted on:2002-01-08Degree:MasterType:Thesis
Country:ChinaCandidate:J ZhangFull Text:PDF
GTID:2206360032954706Subject:Business Administration
Abstract/Summary:PDF Full Text Request
This paper focus on how to control the rate of progress of a construction project for the purpose of seeking the best way to control the project and achieving the highest efficiency in management and the greatest benefit in deals. The project control may change subject to different aims. It?s well known that every project should be managed and dealt with at the lowest cost, the highest rate and the best quality, which is the common aim. However, in fact, cost, rate and quality are the unity of opposites. As for cost and quality, improving quality will increase the precautionary cost and reduce the lost cost at the same time. As for cost and rate, the faster the slower higher rate will have an effect on the quality, meanwhile the improved quality will speed up the rate. Thus, with rate control as its subject, the paper demonstrates how to control the rate of progress and adjust timelimit for a project with network technology. With in the limite the cost and cuality will surely fit with the opration and amatement of this project.
Keywords/Search Tags:schedule control, Operation management, Network technology
PDF Full Text Request
Related items