Font Size: a A A

Research On Stripping And Mining Engineering Plan Optimization During The First-section Mine-turning In Anjialing Open Coal Mine

Posted on:2013-07-28Degree:MasterType:Thesis
Country:ChinaCandidate:C Z GaoFull Text:PDF
GTID:2231330395969362Subject:Mining engineering
Abstract/Summary:PDF Full Text Request
Optimization of the stripping project can directly reflect the benefits of open pitproduction.It is not alone,it is subject to the realm of mine, ore occurrence conditions, miningtechnology, mining and other factors, which determines the economic effects of open pitproduction. Optimization of the stripping project is consist of the peeling amount of rockcomposition and the amount of ore mined.Balanced stripping ratio handles the amount ofstripping rock and the amount of ore mined with the relationship.This paper systematically studied the dynamic programming principle and considering theimpact of various factors. We determine the optimal stripping optimization strategy based onthe principle of the dynamic programming. This paper analyzes the theory of systemsengineering and uses the theory of systems engineering methods to control the stripping ratio ofthe equilibrium. This paper takes the dynamic programming principle and systems engineeringtheory into actual production. This article focuses on the consideration within the open pit dumpAnjialing settings, transport routes, the dynamic programming principle and the reality of mineproduction, and established a suitable Anjialing open-pit mine dynamic programming model,reducing the the stripping peak, balanced stripping ratio, reducing investment costs, increasedmine production.
Keywords/Search Tags:Open-pitmine, Production stripping ratio, Dynamic programming, Systems engineering, Mathematical model
PDF Full Text Request
Related items